FIELD: mining.
SUBSTANCE: blasting of upper packed projection is performed by using the fan switching scheme of borehole charges so that filled-up prism is formed at the bottom of nonworking flank on catching platform and descends to location place of earlier formed transport access tracks, as well as by forming on the prism body of system of temporary transport access tracks and working platforms for simultaneous development of horizons of temporarily nonworking flank.
EFFECT: operational creation of system of temporary access tracks and reduction of costs for formation of route, as well as high runaway speed of temporarily nonworking flank owing to involving several projections into simultaneous development.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
OPEN DEVELOPMENT METHOD OF MINERAL RESOURCES DEPOSITS | 2010 |
|
RU2425977C1 |
OPEN DEVELOPMENT METHOD OF MINERAL RESOURCES DEPOSITS | 2010 |
|
RU2435033C1 |
METHOD FOR REACTIVATION OF PIT EDGE | 2003 |
|
RU2239065C1 |
METHOD OF OPEN DEVELOPMENT OF STEEP DEPOSITS OF AREA FORM | 2013 |
|
RU2533996C1 |
METHOD OF COMBINED OPEN-CUT AND UNDERGROUND STEEPLY PITCHING DEPOSIT DEVELOPMENT | 2005 |
|
RU2278261C1 |
METHOD OF COMBINED DEVELOPMENT OF ELONGATED DEPOSITS OF STEEPLY PITCHING SEAMS | 2013 |
|
RU2515649C1 |
METHOD FOR OPEN DEVELOPMENT OF DEEP-LYING ROUNDED DEPOSITS | 2019 |
|
RU2738148C1 |
METHOD OF OPEN MINING OF STEEPLY PITCHING FIELDS OF AREAL FORM USING HYDRAULIC BACKHOE EXCAVATORS | 2015 |
|
RU2574749C1 |
METHOD OF MINERAL OPENCAST MINING | 0 |
|
SU1730452A1 |
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
Authors
Dates
2011-07-27—Published
2010-03-02—Filed