FIELD: mining.
SUBSTANCE: ecogeotechnological method of repeated underground development of technogenic gravel deposits of permafrost zone involves performance of stripping and mining operations during winter season. Pre-worked out area of earlier developed gravel borehole is reinforced with chain ice pillars erected parallel to those left during primary development of deposit. After that, development of technogenic pillar sands is performed. At that, in order to prevent caving in the ground surface, recovery of the relief and integrity of rock mass disturbed with mining operations, the whole worked-out area is filled with sand-and-stone material.
EFFECT: providing safety of mining operations, reducing volumes of dumps arranged on ground surface, preventing caving of ground surface within the limits of mine field, and recovery of relief and integrity of mine rock.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
CRYOLITHOZONE RESIDUAL-MONOLITHIC DEEP-BURIED GOLD PLACER DEPOSITS SECONDARY UNDERGROUND TREATMENT ECO-GEOTECHNOLOGICAL METHOD | 2017 |
|
RU2678277C1 |
DEVELOPMENT METHOD OF PILLARS OF DRILLED GRAVEL BOREHOLES OF PERMAFROST ZONE | 2010 |
|
RU2436958C2 |
METHOD OF RAISING ARTIFICIAL PEDESTAL-SHAPED PILLARS IN ALLUVIAL WELLS OF PERMAFROST ZONE | 2015 |
|
RU2601704C1 |
ERECTION METHOD OF ARTIFICIAL PEDESTAL-SHAPED PILLARS IN ALLUVIAL WELLS OF PERMAFROST ZONE | 2011 |
|
RU2474695C2 |
UNDERGROUND DEVELOPMENT METHOD OF TECHNOGENIC DEEP-LYING GRAVEL DEPOSITS OF PERMAFROST ZONE | 2010 |
|
RU2452858C2 |
METHOD FOR PLACER MINING | 1992 |
|
RU2039271C1 |
METHOD OF EXCAVATING GRAVEL DEPOSITS | 2007 |
|
RU2347074C1 |
METHOD OF ERECTION OF ARTIFICIAL SAFETY ICE-BROKEN PILLARS AT DEVELOPMENT OF DEPOSITS IN CRYOLITE ZONE | 2019 |
|
RU2723317C1 |
METHOD FOR ARTIFICIAL DEVELOPMENT OF TECHNOGENIC RESERVES | 2019 |
|
RU2700152C1 |
METHOD FOR PLACER DREDGING | 1990 |
|
RU2024753C1 |
Authors
Dates
2011-09-10—Published
2009-12-17—Filed