FIELD: mining.
SUBSTANCE: method involves mining activities performed during summer season by water jet by means of devices installed in underground cavities pre-drilled from surface of the well along longitudinal axes of pillars at certain distance from each other with pulp lifting to the surface and its supply via pulp line to flushing device in order to extract useful component and laying of dehydrated flushing remainders formed during washout process of sands so that distributed filling masses are formed. Pillar recovery is performed in two stages during two years. During the first year the pillars are recovered partially so that gaps are left between cavities washed out between them, which are developed using the same method in the next year; at that, in order to strengthen compression properties of filling masses, they are frozen with natural cold during winter period.
EFFECT: avoiding execution of underground mine workings at pillar extraction; possibility of selective development of technogenic deposit; arrangement of dehydrated flushing remainders in the worked out space and its complete use; avoiding cavings in the ground surface; recovery of rock mass continuity and stabilisation of its temperature mode; minimum contamination of environment; eliminating the necessity for execution of recreation works.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
UNDERGROUND DEVELOPMENT METHOD OF TECHNOGENIC DEEP-LYING GRAVEL DEPOSITS OF PERMAFROST ZONE | 2010 |
|
RU2452858C2 |
ECOGEOTECHNOLOGICAL METHOD OF REPEATED UNDERGROUND DEVELOPMENT OF TECHNOGENIC GRAVEL DEPOSITS OF PERMAFROST ZONE | 2009 |
|
RU2428567C1 |
ERECTION METHOD OF ARTIFICIAL PEDESTAL-SHAPED PILLARS IN ALLUVIAL WELLS OF PERMAFROST ZONE | 2011 |
|
RU2474695C2 |
METHOD OF RAISING ARTIFICIAL PEDESTAL-SHAPED PILLARS IN ALLUVIAL WELLS OF PERMAFROST ZONE | 2015 |
|
RU2601704C1 |
CRYOLITHOZONE RESIDUAL-MONOLITHIC DEEP-BURIED GOLD PLACER DEPOSITS SECONDARY UNDERGROUND TREATMENT ECO-GEOTECHNOLOGICAL METHOD | 2017 |
|
RU2678277C1 |
METHOD OF ERECTION OF ARTIFICIAL SAFETY ICE-BROKEN PILLARS AT DEVELOPMENT OF DEPOSITS IN CRYOLITE ZONE | 2019 |
|
RU2723317C1 |
METHOD OF DEVELOPMENT OF UNDERFLOW GRAVEL DEPOSIT UNDER CONDITIONS OF CRYOLITE ZONE | 2007 |
|
RU2349755C2 |
METHOD OF UNDERGROUND MINING OF DEPOSITS IN CRYOLITIC ZONE | 2000 |
|
RU2168627C1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF ORE DEPOSITS IN CRYOLITHIC ZONE | 2007 |
|
RU2369741C2 |
METHOD OF PROTECTING LEDGES OF EDGES OF PITS OF CRYOLITHIC ZONE FROM THAWING | 2014 |
|
RU2551583C1 |
Authors
Dates
2011-12-20—Published
2010-03-15—Filed