ISOLATION METHOD OF PRODUCTIVE FORMATION FROM BOTTOM WATER INFLOW Russian patent published in 2012 - IPC E21B33/13 

Abstract RU 2444611 C1

FIELD: oil and gas industry.

SUBSTANCE: isolation method of productive formation from bottom water inflow involves well drilling with opening of productive formation and arrangement of the working face below the level of oil-water contact (OWC), installation of casing pipes above OWC level with further cementing, cleaning of the well below casing pipes, pumping of waterproofing sealant to the cleaned well zone with isolation of bottom water and perforation of casing pipes. Well is drilled in two stages, the first one of which is performed with the main shaft to the roof of productive formation, and the second one - with pilot shaft of smaller diameter. Formation properties are investigated, and the main shaft is deepened to the level located above OWC level before casing pipes are installed. Shaft cleaning below casing pipes is performed after cementing by drilling the pilot shaft with the bit of larger diameter below OWC, and OWC zone is perforated.

EFFECT: method provides the creation of a reliable screen in OWC zone owing to avoiding the operation used for creation of sand-clay plug and cleaning of the well shaft in OWC zone after it is drilled and reinforced with casing pipes, creation of reliable waterproofing screen due to OWC zone perforation, reduction of costs for waterproofing sealant, which is due to the fact that it is pumped directly to OWC zone after perforation.

4 dwg

Similar patents RU2444611C1

Title Year Author Number
DEVELOPMENT OF INHOMOGENEOUS DEPOSIT BY INCLINED AND HORIZONTAL WELLS 2013
  • Takhautdinov Shafagat Fakhrazovich
  • Ibatullin Ravil' Rustamovich
  • Bakirov Il'Shat Mukhametovich
  • Idijatullina Zarina Salavatovna
RU2524800C1
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Leonteva Natalya Alekseevna
  • Ponomarev Andrej Aleksandrovich
  • Aleksandrov Vadim Mikhajlovich
RU2661935C1
PROCESS OF PUMPING TREATMENT MORTARS DOWN BOREHOLE 1993
  • Petrov Nikolaj Aleksandrovich
  • Sagdeev Shamil' Khalitovich
RU2057898C1
METHOD FOR ISOLATING WATER INFLOW IN A FORMATION WITH BOTTOM WATER 2021
  • Nazimov Nafis Anasovich
RU2775120C1
METHOD OF INCREASING OIL YIELD IN INHOMOGENEOUS, HIGHLY-FLOODED, POROUS AND FRACTURED-POROUS, LOW- AND HIGH-TEMPERATURE PRODUCTIVE STRATUM 2013
  • Apasov Gajdar Timergaleevich
  • Apasov Timergalej Kabirovich
  • Mukhametshin Vadim Gabdulovich
  • Sakhipov Damir Midkhatovich
  • Apasov Renat Timergaleevich
RU2528805C1
METHOD OF PREVENTING WATER FLOW IN WELL DEVELOPED OIL IN WATER RESERVOIR 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Leonteva Natalya Alekseevna
  • Vaganov Yurij Vladimirovich
  • Semenenko Anastasiya Fedorovna
  • Baluev Anatolij Andreevich
RU2665769C1
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY 2013
  • Apasov Gajdar Timergaleevich
  • Apasov Timergalej Kabirovich
  • Kuzjaev Ehl'Mir Sattarovich
  • Apasov Renat Timergaleevich
RU2539047C1
METHOD FOR DEVELOPMENT OF FORMATION WITH BOTTOM WATER 2020
  • Nazimov Nafis Anasovich
  • Nazimov Timur Nafisovich
  • Minikhairov Lenar Ilfatovich
RU2738146C1
WELL COMPLETION METHOD 2023
  • Zaripov Ildar Mukhamatullovich
  • Iskhakov Albert Ravilevich
RU2795281C1
METHOD FOR EXPLOITATION OF A DEPOSIT WITH POROUS-CAVERNOUS-FRACTURED RESERVOIR BY HORIZONTAL WELLS 2022
  • Nazimov Nafis Anasovich
  • Nazimov Timur Nafisovich
RU2776552C1

RU 2 444 611 C1

Authors

Khisamov Rais Salikhovich

Ibatullin Ravil' Rustamovich

Abdrakhmanov Gabdrashit Sultanovich

Nuriev Il'Jas Akhmatgalievich

Khamit'Janov Nigamat'Jan Khamitovich

Vil'Danov Nail' Nazymovich

Ilalov Rustam Khisamovich

Sajfullin Almaz Kamilevich

Dates

2012-03-10Published

2010-08-31Filed