FIELD: oil and gas industry.
SUBSTANCE: development method of high-viscosity oil and bitumen deposit involves drilling and arrangement at least of two vertical wells with further secondary opening in them of upper and lower parts of productive formation, lowering to each well of tubing string with packer and separation of opening intervals with packer in production string, cyclic steam pumping to the formation through upper opening interval and extraction of formation fluid through lower opening interval. Between wells there drilled and arranged at equal distance is additional vertical well so that constant extraction of formation fluid from secondary opened lower part of productive formation and cutting of branch holes in upper part of productive formation is provided. Branch holes are made in inclined direction from roof to bottom of productive formation in the direction of peripheral wells with distance of inclined section, which is determined with linear size of its horizontal projection within the limits of 5-95% of the shortest distance to peripheral wells. In branch holes there separately provided is constant steam pumping to lower part of productive formation and steam pumping to upper part of productive formation when steam pumping to peripheral wells is stopped. At that, from peripheral wells via tubing string there performed is extraction of formation fluid in constant mode, and steam pumping to tube space of peripheral wells is stopped at water flooding of formation fluid to 95-97% and steam pumping is renewed when water flooding of formation fluid is decreased to 85%.
EFFECT: intensifying formation fluid inflow to wells at development of high-viscosity oil and bitumen deposit which is non-homogeneous as per the productive formation section, especially at its early stage.
1 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HIGHLY-VISCOUS OIL OR BITUMEN DEPOSIT DEVELOPMENT | 2005 |
|
RU2273729C1 |
METHOD FOR DEVELOPING SUPERVISCOUS OIL DEPOSITS | 2023 |
|
RU2803344C1 |
METHOD FOR DEVELOPMENT OF LAYER-BY-LAYER-ZONAL-HETEROGENEOUS DEPOSITS OF SUPER-VISCOUS OIL OR BITUMEN | 2021 |
|
RU2761799C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES | 2010 |
|
RU2442883C1 |
METHOD FOR DEVELOPING HIGH-VISCOSITY AND BITUMINOUS OIL DEPOSITS | 2022 |
|
RU2781983C1 |
METHOD FOR EXTRACTING DEPOSIT OF HIGH VISCOSITY OIL OR BITUMEN | 2005 |
|
RU2287679C1 |
METHOD FOR EXTRACTING HETEROGENEOUS OIL-BITUMEN DEPOSIT | 2005 |
|
RU2287678C1 |
METHOD OF SUPER-VISCOUS OIL FIELD DEVELOPMENT | 2017 |
|
RU2690588C2 |
METHOD FOR DEVELOPING OF RESERVOIR OF SUPER-VISCOUS OIL OR BITUMEN UNDER THERMAL EXPOSURE | 2018 |
|
RU2673825C1 |
METHOD FOR EXTRACTING OIL-BITUMEN DEPOSIT | 2005 |
|
RU2287677C1 |
Authors
Dates
2012-03-27—Published
2010-10-12—Filed