FIELD: machine building.
SUBSTANCE: test is carried out at increased pressure directly in protective jacket. Note here that test pressure should be 5% higher than that causing lengthwise stresses equal to those originating in operation and 5% lower than design pressure of destruction of faulty pipe with residual life making at least 15 years. Note that it should vary from 1.1…1.25 of operating pressure.
EFFECT: simplified method, reduced labor input in test.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REHABILITATION AND DETERMINATION OF OPERATIONAL RESOURCES OF TRUNK PIPELINE DURING PRESSURE OVERLOADS AT FIELDS CONDITIONS | 2007 |
|
RU2324160C1 |
METHOD OF EVALUATING STRESS-STRAIN STATE OF A PIPELINE WITH FAULTY WELDED JOINTS | 2016 |
|
RU2656163C2 |
PIPELINE REPAIR METHOD | 2015 |
|
RU2599401C2 |
METHOD OF ERECTION OF PIPE LINES | 1999 |
|
RU2171939C2 |
METHOD FOR DETERMINING PIPELINE SERVICE LIFE | 2013 |
|
RU2518787C1 |
METHOD OF PIPELINE REPAIR | 2011 |
|
RU2493468C2 |
METHOD OF PIPELINE REPAIR | 2012 |
|
RU2493472C1 |
METHOD FOR ASSESSING THE DEGREE OF DANGER OF DEFECTIVE RING JOINTS ON MAIN GAS PIPELINES | 2021 |
|
RU2798635C1 |
METHOD TO RECOVER BEARING CAPACITY OF PIPELINE | 2013 |
|
RU2516766C1 |
METHOD OF REPAIRING HIGH-PRESSURE MAIN GAS PIPELINE HAVING ISOLATION COATING DEFECTS (PIPE-CASING CONTACTS) LOCATED UNDER ROAD PAVEMENT AND CROSSING ROAD TRAFFIC WAY | 2002 |
|
RU2232332C2 |
Authors
Dates
2012-03-27—Published
2010-02-24—Filed