FIELD: construction.
SUBSTANCE: development of a technology for erection of pile bridge footings of long span bridge structures of significant length on a water area during realisation of a pioneer method of construction with application of temporary supports and conductors of special design for submersion of the main (capital) piled supports.
EFFECT: reduction of construction time and lower labour intensiveness of works with simplification of the process of erection of pile bridge footings, increased reliability of assembly and continuity of operation regardless of weather conditions and roughness on a water area.
9 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF BRIDGE ON WATER AREA | 2011 |
|
RU2483153C2 |
TECHNOLOGICAL COMPLEX FOR ERECTION OF HYDRAULIC ENGINEERING WORK | 2013 |
|
RU2540602C2 |
METHOD OF CONSTRUCTING RECREATION COMPLEX ABOVE SEA AREA NEARBY UNUSED HIGH CLIFFED COAST WITH NO BEACHES | 2011 |
|
RU2474649C2 |
HYDRAULIC STRUCTURE WITH VERTICAL PROFILE ON PILE BASE AND METHOD OF ITS ERECTION | 2014 |
|
RU2568497C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
PROTECTIVE CASE FOR BRIDGE PIER GRILLAGE AND ERECTION METHOD THEREOF | 2004 |
|
RU2263176C1 |
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
SCAFFOLD FOR BRIDGE SPAN STRUCTURE MOUNTING | 2004 |
|
RU2275455C2 |
METHOD FOR MOUNTING LARGE-SPAN COVERINGS WITH PUSHING FORCE | 2021 |
|
RU2789028C1 |
MULTI-RAIL TRESTLE ROAD, REVOLVER UNIT AND METHOD OF CONSTRUCTION OF THE ROAD | 2016 |
|
RU2623786C1 |
Authors
Dates
2012-04-10—Published
2010-08-09—Filed