FIELD: construction.
SUBSTANCE: immersion of piles, installation of crossbars, laying of slabs and installation of tracks from rail assemblies is carried out by one turret unit consisting of a body on a railway run and a swing tower, on one side of which there is a device for piling, and on the opposite side there is a manipulator with the gripping device for the installation of crossbars, plates and rail assemblies. The totality of the properties of the turret unit and the multi-rail road, vehicles for the movement of which have the ability of transverse displacement, allow construction to be carried out in a way in which the construction of the next section of the road is made from the edge of the already constructed section and only from it.
EFFECT: condition is created for the construction of a road in a fully automatic mode, there is no need to build auxiliary roads with their subsequent reclamation.
3 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
AUTOMOBILE ROAD | 2014 |
|
RU2589138C2 |
MULTITRACK RAILWAY AND TRAIN WITH TRANSVERSE DISPLACEMENT MECHANISM | 2009 |
|
RU2439236C2 |
METHOD FOR CONSTRUCTION OF GROUP PILE FOUNDATION FOR BORING AND OPERATION OF WELLS IN OIL AND GAS DEPOSITS | 2007 |
|
RU2353727C1 |
COMPLEX FOR CONSTRUCTION OF MOTOR ROAD ON PILES | 2010 |
|
RU2453650C1 |
CONSTRUCTION OF PREFABRICATED GROUND FOUNDATION FOR HIGH-SPEED RAIL TRANSPORT OVERPASS | 2023 |
|
RU2814450C1 |
METHOD FOR CONSTRUCTION OF HYDRAULIC STRUCTURES ON ROCKY SOILS | 2023 |
|
RU2816995C1 |
METHOD FOR MOTOR ROAD CONSTRUCTION | 2015 |
|
RU2626107C2 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
DEVICE FOR SUBGRADE OF HIGH-SPEED IN AREAS WITH DEVELOPMENT OF KARST-SUFFUSION PROCESSES | 2018 |
|
RU2681179C1 |
METHOD FOR BUILDING PIER ON ROCK BASE AND PIER ON ROCK BASE OBTAINED BY THIS METHOD | 2020 |
|
RU2757733C1 |
Authors
Dates
2017-06-29—Published
2016-05-04—Filed