FIELD: construction.
SUBSTANCE: method and device for partial or full foaming of cavities in a ballast structure of a ballast layer, under which an earth bed (7) is located, are realised with a reactive polymer, besides, reactive components are mixed in a high-pressure mixer (1, 26). The start time for a reactive mixture (4) is set so that the process of foaming substantially starts only when the reactive mixture reaches the earth bed (7).
EFFECT: longer service life of a ballast layer.
22 cl, 9 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD OF BALLAST PRISMS FORMING | 2012 |
|
RU2604749C2 |
| RAILWAY RAIL LENGTH (VERSIONS) | 2007 |
|
RU2381317C2 |
| METHOD FOR PRODUCTION OF BALLAST LAYER | 2012 |
|
RU2604899C2 |
| STRUCTURE OF TRAM TRACK WITH TOP COATING OF ASPHALT CONCRETE | 2024 |
|
RU2834498C1 |
| STRUCTURE OF TRAMWAY WITH STOPPING PLATFORM | 2024 |
|
RU2834497C1 |
| STRUCTURE OF SINGLE-TRACK SECTION OF TRAM TRACK WITH PLATE | 2024 |
|
RU2834327C1 |
| DESIGN OF SINGLE-TRACK SECTION OF TRAMWAY TRACK | 2024 |
|
RU2834347C1 |
| METHOD OF REINFORCING RAILWAY TRACK BALLAST SECTION | 2014 |
|
RU2583112C2 |
| REINFORCED CONCRETE UNDERRAIL BASE AND METHOD OF ITS CONSTRUCTION | 2004 |
|
RU2250279C1 |
| STRUCTURE OF TRAM TRACK WITH UPPER COATING OF LARGE-SIZE PLATES | 2024 |
|
RU2834496C1 |
Authors
Dates
2012-04-20—Published
2008-04-12—Filed