FIELD: mining.
SUBSTANCE: method involves routing of main pipeline, drilling in mine rock of controlled directional well developing the hydrocarbon field, installation of string of pipes in it, which are connected to main pipeline. From day surface of land shore or oceanic islands at the distance equal to the distance of not less than maximum movement of drifting ices by land from the shore edge there passed is vertical well shaft through the depth equal to distance from land surface to permafrost formations; at that, mouth of controlled directional well is located at the bottom of well shaft or vertical well is passed from bottom of well shaft with further drilling of cluster of controlled directional wells out of it to the field development point.
EFFECT: trouble-free production of hydrocarbons deposited below the sea bottom; improvement of service life of drill pipes and pipeline.
1 ex, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTING COASTAL MULTI-HOLE GAS WELL FOR DEVELOPMENT OF SHELF DEPOSIT | 2015 |
|
RU2602257C2 |
METHOD FOR BUILDING WELLS WITH REMOTE FACE | 2006 |
|
RU2295024C1 |
DESIGN OF COASTAL MULTI-HOLE INTELLIGENT GAS WELL FOR DEVELOPMENT OF OFFSHORE DEPOSIT | 2015 |
|
RU2580862C1 |
DEVICE FOR WELL HOLE MAKING WITH WORKING FACE | 2008 |
|
RU2409734C2 |
BORE-WELL SYSTEM OF OIL AND GAS PRODUCTION FROM OFFSHORE FIELDS AND METHOD OF SYSTEM APPLICATION | 2009 |
|
RU2405917C1 |
DEVELOPMENT OF MARINE DEEP SEA OIL-AND-GAS DEPOSITS | 2013 |
|
RU2547161C2 |
METHOD OF DEVELOPMENT OF HYDROCARBONS /OIL AND GAS/ AND UNDERWATER DRILLING RIG FOR IMPLEMENTATION OF THIS METHOD IN ARCTIC SHELF | 2008 |
|
RU2380541C2 |
METHOD FOR ADVANCE DRILLING OF PILOT SHAFTS DURING CONSTRUCTION OF WELLS ON SHELF | 2023 |
|
RU2818392C1 |
METHOD FOR SEISMIC MONITORING OF DEVELOPMENT OF HYDROCARBON DEPOSITS ON WATER AREAS | 2013 |
|
RU2540005C1 |
PROCESS OF LAYING OF HORIZONTAL HOLE | 1999 |
|
RU2159318C1 |
Authors
Dates
2012-04-20—Published
2010-11-24—Filed