FIELD: construction.
SUBSTANCE: new technical solutions: pile foundations are made by pouring of wells drilled in each transverse row together with the support beam above the wells using inventory formwork, the full road construction cycle is divided into stages, separated in space along the axis of the constructed road.
EFFECT: possibility to use batch tools of work and to work in parallel at all construction stages, significant reduction of terms and work cost reduction, expansion of application, increasing pavement stability in terms of exposure to climatic factors.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPLEX FOR CONSTRUCTION OF MOTOR ROAD ON PILES | 2010 |
|
RU2453650C1 |
METHOD OF BUILDING PREFABRICATED ROAD AND AERODROME PAVEMENTS FROM PRESTRESSED REINFORCED CONCRETE SLABS | 2021 |
|
RU2767640C1 |
MULTI-RAIL TRESTLE ROAD, REVOLVER UNIT AND METHOD OF CONSTRUCTION OF THE ROAD | 2016 |
|
RU2623786C1 |
TRANSPORTATION COMPLEX OF MEGAPOLICE AND METHOD FOR REGULATING AND RELIEVING PASSENGER, CARGO-PASSENGER AND CARGO TRAFFIC FLOWS IN IT | 1998 |
|
RU2135670C1 |
TRANSPORT COMPLEX OF MEGALOPOLIS AND METHOD FOR CONTROL AND RELIEF OF PASSENGER, FREIGHT - PASSENGER AND FREIGHT TRAFFICS OF MEGALOPOLIS TRANSPORT COMPLEX | 1998 |
|
RU2140480C1 |
METHOD FOR CONSTRUCTION OF PILE-PLATE FOUNDATION | 2021 |
|
RU2774443C1 |
"AIR" ROAD SURFACE | 2013 |
|
RU2592321C2 |
CONSTRUCTION OF PREFABRICATED GROUND FOUNDATION FOR HIGH-SPEED RAIL TRANSPORT OVERPASS | 2023 |
|
RU2814450C1 |
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST | 2012 |
|
RU2513574C2 |
EARTHWORKS STRENGTHENING METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2609505C1 |
Authors
Dates
2017-07-21—Published
2015-04-29—Filed