FIELD: mining.
SUBSTANCE: attachment of mine workings cupola is performed by means of backfilling of its space using pneumatic bottles. At that pass to cupola is formed in roof and bearing floor is made at level of roof beam of mine workings support. Pneumatic bottles are arranged above support through pass opening at cupola outlet, and then they are filled with compressed air. When cupola space is filled in sequence with pressurised pneumatic bottles, pass opening is closed.
EFFECT: simplifying technology of mine workings cupola backfilling and increasing safety level.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
MINE WORKING LINING METHOD | 2009 |
|
RU2418170C1 |
METHOD FOR REINFORCEMENT OF MINES | 2012 |
|
RU2495247C1 |
METAL YIELDING FRAME SUPPORT FROM MINE SPECIAL CHANNELS TO SUPPORT MINE OPENING AT UNDERGROUND DEVELOPMENT OF MINERAL DEPOSITS | 2009 |
|
RU2429348C2 |
METHOD OF CROSSOVER WITH WORKING FACE OF DEVELOPMENT PASSED WITH FORMATION ROOF SLASHING | 2011 |
|
RU2472934C1 |
METHOD FOR WORKING CROSSING BY WORKING FACE COVERED BY FORMATION FOOTWALLING | 2010 |
|
RU2459080C1 |
METHOD OF REPAIRING MINE WORKING IN SALT DEPOSITS | 2009 |
|
RU2405111C1 |
ROOF CONTROL METHOD | 2005 |
|
RU2283958C1 |
METHOD FOR STRENGTHENING OF MINES | 2009 |
|
RU2387840C1 |
PNEUMATIC CHOCK | 0 |
|
SU658287A1 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
Authors
Dates
2012-06-27—Published
2010-02-24—Filed