FIELD: construction.
SUBSTANCE: method to remove snow and ice from a roof includes melting of snow and ice, at the same time icicles are first cut from roof eaves with the help of at least one steam jet, then ice and snow are melted in the gutter system by means of steam supply into water pipe drains and gutters of the gutter system, afterwards snow and ice are melted on the roof by supply of steam jets.
EFFECT: higher efficiency, reliability and safety of snow and ice removal from a roof, reduced power inputs, simplified process of snow and ice removal, expanded area of snow and ice removal.
8 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
UTILISATION METHOD OF ICE CRUSTS AND ICICLES FROM ROOFS OF BUILDINGS AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2555722C1 |
METHOD TO DRAIN WATER FROM MELTED SNOW AND RAIN WATER FROM THE OUTSIDE OF INCLINED ROOF | 2005 |
|
RU2299956C2 |
ROOF CORNICE | 0 |
|
SU953143A1 |
BUILDING WITH PITCHED ROOF HAVING DEVICE FOR PREVENTION OF FORMATION OF ICICLES, ICE CRUST AND SNOW CORNICES ON ROOF | 2011 |
|
RU2481443C1 |
DEVICE FOR DECAY OF ICICLES FROM BUILDINGS ROOF | 2018 |
|
RU2692376C1 |
PROTECTION METHOD OF ROOFS OF BUILDINGS AGAINST FORMATION OF ICICLES | 2014 |
|
RU2560759C1 |
ARRANGEMENT OF BUILDING AND STRUCTURE ROOF | 2012 |
|
RU2494199C1 |
METHOD TO REMOVE ICICLES AND SNOW DRIFTS AND DEVICE FOR REALISATION OF THIS METHOD | 2011 |
|
RU2484215C1 |
BUILDING OR BUILDING STRUCTURE ROOF ASSEMBLY | 2005 |
|
RU2296840C1 |
DEVICE TO PROTECT BUILDING ROOF AGAINST ICE AND ICICLE FORMATION | 2006 |
|
RU2310727C1 |
Authors
Dates
2012-07-27—Published
2011-03-25—Filed