FIELD: construction.
SUBSTANCE: roofing is first coated with a material layer with a hygroscopic and hydrophilic property, and then screen snow barriers are installed with a coating from a material with coating properties on a roofing, and provide for tight adjacency of the screen snow barrier coating to the roofing surface.
EFFECT: reduced operation costs for roof maintenance.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE TO PREVENT ICICLES FALLING OFF EXTERNAL EDGE OF ROOF | 2011 |
|
RU2458218C1 |
DEVICE TO PREVENT ICICLES FROM FALLING OFF PITCHED ROOF | 2013 |
|
RU2526077C1 |
METHOD FOR COLLECTING ATMOSPHERIC PRECIPITATION FROM A PITCHED ROOF OF A BUILDING AND DEVICE FOR IMPLEMENTATION THEREOF | 2017 |
|
RU2654091C1 |
ARANGEMENT OF BUILDING AND STRUCTURE ROOF | 2007 |
|
RU2338853C1 |
DEVICE TO PROTECT BUILDING ROOF AGAINST ICE AND ICICLE FORMATION | 2006 |
|
RU2310727C1 |
ROOF CORNICE | 0 |
|
SU953143A1 |
DEVICE FOR PROTECTION OF STRUCTURE ROOF AGAINST FORMATION OF ICE CRUST AND CLOGGING OF GUTTERS | 2007 |
|
RU2353739C1 |
ARRANGEMENT OF BUILDING AND STRUCTURE ROOF | 2012 |
|
RU2494199C1 |
DEVICE FOR REMOVAL OF MELT WATER FROM ROOFS | 2016 |
|
RU2688655C2 |
BUILDING OR BUILDING STRUCTURE ROOF ASSEMBLY | 2005 |
|
RU2296840C1 |
Authors
Dates
2012-09-10—Published
2011-05-16—Filed