FIELD: construction.
SUBSTANCE: invention relates to construction, namely to devices for removal of melt waters from roofs and prevention of formation of icicles and ice crusts on roofs of houses and formation of ice plugs in downpipes. Device consists of guides, snow retaining beam, drain tray made of thin sheet material and coated with foil-insulated, additional built-in funnel and insert in the bend of downpipe in its presence. Drain tray, additional funnel and insert are coated with dark-coloured hydrophobic mastic.
EFFECT: technical result of invention consists in improvement of roof load-carrying capacity.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
ARRANGEMENT OF BUILDING AND STRUCTURE ROOF | 2012 |
|
RU2494199C1 |
BUILDING WITH PITCHED ROOF HAVING DEVICE FOR PREVENTION OF FORMATION OF ICICLES, ICE CRUST AND SNOW CORNICES ON ROOF | 2011 |
|
RU2481443C1 |
DEVICE TO PROTECT BUILDING ROOF AGAINST ICE AND ICICLE FORMATION | 2006 |
|
RU2310727C1 |
ARANGEMENT OF BUILDING AND STRUCTURE ROOF | 2007 |
|
RU2338853C1 |
ROOF CORNICE | 0 |
|
SU953143A1 |
METHOD OF BUILDING ROOF COLLECTING SYSTEMS PROTECTION AGAINST ICING | 2009 |
|
RU2439260C2 |
ANTI-ICING ROOFING OF SLOPING OR CONDITIONALLY FLAT ROOFS, RECONSTRUCTION METHOD FOR EXISTENT OUTER ORGANIZED WATER DRAINAGE SYSTEM, WHICH DRAINS WATER, PREFERABLY WATER FROM MELTED SNOW, FROM INCLINED METAL ROOFING, AND ANTI-ICING WALL GUTTER FOR ABOVE RECONSTRUCTION REALIZATION | 2005 |
|
RU2301869C2 |
METHOD FOR ARRANGING LOWER PART OF SLATE ROOF | 2020 |
|
RU2751306C1 |
BUILDING OR BUILDING STRUCTURE ROOF ASSEMBLY | 2005 |
|
RU2296840C1 |
METHOD TO PROTECT SURFACE OF DRAIN ELEMENTS OF MATERIAL FACILITY ROOF AGAINST ICING | 2012 |
|
RU2495208C1 |
Authors
Dates
2019-05-21—Published
2016-03-16—Filed