FIELD: construction.
SUBSTANCE: method to arrange a downhole structure includes arrangement of a dense and compacted assembly site from loose soil, levelling of its surface, assembly of a cutting part of a knife, arrangement of formwork for downhole structure walls and installation of reinforcement, and then layerwise concreting of walls and pumping of water and sludge mass up to concreting of the structure base. Upon completion of foundation concreting the structure is filled with water to the level of ground waters, and after concrete gains rated strength, water from the structure is pumped.
EFFECT: provides for prevention of downhole structure foundation damage due to elimination of hydraulic head action at a structure foundation at the side of ground waters.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
DOWNTAKE FACILITY | 2009 |
|
RU2418135C2 |
DROP STRUCTURE | 2015 |
|
RU2582148C1 |
METHOD FOR LOWERING OF UNDERWATER LEVEL IN CONSTRUCTION AND OPERATION OF UNDERGROUND STRUCTURES LOCATED BELOW UNDERWATER LEVEL AND DEVICE FOR METHOD REALISATION | 2007 |
|
RU2357045C2 |
METHOD TO ERECT SOLID REINFORCED CONCRETE WALL IN SOIL | 2014 |
|
RU2555987C1 |
RESTORATION METHOD FOR QUARRY FACES, WHICH WERE DISRUPTED DURING EXPLOITATION THEREOF | 2002 |
|
RU2225479C1 |
METHOD OF BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN PITS | 2023 |
|
RU2811514C1 |
METHOD FOR CONSTRUCTION OF FOUNDATION PIT | 2001 |
|
RU2190725C1 |
METHOD TO CONSTRUCT MULTISTOREY UNDERGROUND STRUCTURES UNDER COMPLICATED ENGINEERING-GEOLOGICAL CONDITIONS | 2009 |
|
RU2417285C1 |
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
METHOD FOR BUILDING UNDERGROUND CONSTRUCTION UNDER COMPLICATED ENGINEERING AND GEOLOGICAL CONDITIONS | 1995 |
|
RU2099473C1 |
Authors
Dates
2012-10-27—Published
2011-04-08—Filed