FIELD: construction.
SUBSTANCE: foundation includes boards arranged on a levelling sand preparatory base, having limiters under a foot. Boards have through slots along edges, and limiters are arranged in the form of flat plates, as capable of their insertion into through slots.
EFFECT: increased rated resistance of base soil, increased bearing capacity and reduced subsidence of a structure.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREPARING THE BASE OF A CYLINDRICAL TANK ON SOFT SOILS | 2022 |
|
RU2783072C1 |
METHOD FOR REINFORCEMENT OF PILE FOUNDATION | 2019 |
|
RU2728052C1 |
METHOD FOR REINFORCEMENT OF PILE FOUNDATION | 2019 |
|
RU2722901C1 |
METHOD FOR CORRECTION OF VERTICAL POSITION OF BUILDINGS AND STRUCTURES ON PANEL-WALL FOUNDATION | 2007 |
|
RU2352723C1 |
METHOD OF SECURING WEAK SOIL AT THE BASE OF A FOUNDATION SLAB | 2023 |
|
RU2807344C1 |
METHOD FOR FOUNDATION ENHANCING | 2015 |
|
RU2596621C1 |
METHOD FOR ERECTION OF COMPREHENSIVE DEVELOPMENT BUILDING | 2008 |
|
RU2391464C2 |
METHOD OF FOUNDATION CONSTRUCTION AND HOW IT IS SET UP | 2015 |
|
RU2645686C2 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD TO CONSTRUCT BUILDINGS, STRUCTURES ON UNEVENLY COMPRESSIBLE SOILS | 2011 |
|
RU2494194C2 |
Authors
Dates
2012-11-27—Published
2011-04-08—Filed