FIELD: process engineering.
SUBSTANCE: proposed method consists in increasing intensity of heating top curved belt by winter solar rays by covering exposed ice surface in preset zone adjoining top curved belt edge with snow to up reflection of solar rays from reservoir winter surface. Curved belt top edge, above ice level in reservoir, is covered with the layer of dark material to up absorption of solar rays.
EFFECT: higher efficiency.
4 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INCREASE RELIABILITY OF CONCRETE ARC GRAVITATION DAM UNDER OPERATION | 2010 |
|
RU2434993C1 |
METHOD TO INCREASE RELIABILITY OF CONCRETE ARC-GRAVITY DAM IN OPERATION | 2010 |
|
RU2418911C1 |
METHOD TO INCREASE RELIABILITY AND DURABILITY OF STEEL REINFORCED CONCRETE TURBINE WATER CONDUIT | 2010 |
|
RU2433222C1 |
DAM OF SOIL MATERIALS | 2011 |
|
RU2469147C1 |
ROCK AND EARTH DAM | 2011 |
|
RU2474646C1 |
UNIT OF GROUND DAM COUPLING WITH CONCRETE OVERFLOW WEIR | 2011 |
|
RU2448214C1 |
SECTION OF MOTOR ROAD WITH CULVERT UNDER EMBANKMENT IN CONDITIONS OF NORTHERN CONSTRUCTION-CLIMATIC ZONE | 2009 |
|
RU2385983C1 |
ROCK AND EARTH DAM | 2011 |
|
RU2474645C1 |
PIPE CULVERT UNDER BANKED EARTH IN CONDITIONS OF NORTHERN CLIMATIC BUILDING ZONE AND OPERATION METHOD THEREOF | 2009 |
|
RU2381328C1 |
DAM FROM SOIL MATERIALS | 2011 |
|
RU2465395C1 |
Authors
Dates
2013-02-10—Published
2011-10-25—Filed