METHOD OF HYDRODYNAMIC INVESTIGATIONS OF OIL WELLS EQUIPPED WITH ELECTRIC-CENTRIFUGAL PUMPS WITH CONVERTER OF CURRENT FREQUENCY Russian patent published in 2013 - IPC E21B47/00 E21B43/25 

Abstract RU 2475640 C2

FIELD: oil and gas industry.

SUBSTANCE: invention refers to methods of hydrodynamic investigations of oil wells equipped with submersible electric-centrifugal pumps and control stations with frequency converters, and it may be used for choice of optimum operating mode of well. Method of hydrodynamic investigations of oil well involves connection of electric-centrifugal pump to production electric network through converter of frequency of current supplied to electric-centrifugal pump. Well flow rate is measured as per oil during operation in mode of rated power frequency. Depression is created by means of increase in electric-centrifugal pump efficiency due to increase in current frequency to the value providing steady mode of well operation under which well flow rate as per fluid is maximum. Well flow rate is measured as per fluid, also water content of its products is measured during operation in mode of rated frequency. When maximum value is reached current frequency is reduced to the value providing steady mode of well operation under which well flow rate as per fluid is minimum. Increase and reduction of current frequency is performed during continuous operation of electric-centrifugal pump with repeated measurement of pressure and temperature at pump suction, well flow rate and water content on wellhead. As per the measurements results curve is built for pressure recovery during transition of well operation mode at which well flow rate as per fluid is maximum to operation mode at which well flow rate as per fluid is minimum. Then hydro- and piezo-conductivity, permeability, supply contour radius, skin factor are determined. Also optimum frequency of current supplied to electric-centrifugal pump, under which reduction of water content and increase in flow rate as per oil relative to analogous values during well operation in mode of rated frequency is provided, is determined.

EFFECT: improving efficiency of determination of optimum mode of removals from formation under which product water content is reduced and flow rate as per oil relative to analogous values during well operation in mode of rated frequency increases.

3 cl, 9 dwg

Similar patents RU2475640C2

Title Year Author Number
METHOD OF WELL OPERATION OPTIMIZATION EQUIPPED WITH A DOWNHOLE PUMP 2018
  • Ivanovskij Vladimir Nikolaevich
  • Sabirov Albert Azgarovich
  • Degovtsov Aleksej Valentinovich
  • Bulat Andrej Vladimirovich
  • Gerasimov Igor Nikolaevich
  • Yakimov Sergej Borisovich
RU2700149C1
METHOD FOR REGULATING THE ENERGY CONSUMPTION OF OIL-PRODUCING DOWNHOLE EQUIPMENT 2022
  • Noskov Andrej Borisovich
  • Zuev Aleksej Sergeevich
  • Volokitin Konstantin Yurevich
  • Klyushin Igor Gennadevich
  • Bylkov Vasilij Vladimirovich
  • Kaverin Mikhail Nikolaevich
  • Shalagin Yurij Yurevich
  • Tarasov Vitalij Pavlovich
  • Russkin Evgenij Nikolaevich
  • Novokreshchennykh Denis Vyacheslavovich
  • Shportko Anton Aleksandrovich
  • Naumov Ivan Vyacheslavovich
RU2773403C1
METHOD FOR REGULATING THE OPERATING MODE OF A WELL EQUIPPED WITH AN ELECTRIC CENTER PUMP INSTALLATION IN AN INTER-WELL PUMPING SYSTEM 2021
  • Akhmadiev Ravil Nurovich
  • Ivanov Vladimir Aleksandrovich
  • Artiukhov Aleksandr Vladimirovich
  • Latfullin Rustem Ruslanovich
  • Minekaev Rustam Masgutovich
RU2758326C1
METHOD FOR DUAL OPERATION OF OIL WELL EQUIPPED WITH ELECTRIC-CENTRIFUGAL PUMP 2013
  • Korovin Valerij Mikhajlovich
  • Adiev Il'Dar Javdatovich
  • Safiullin Il'Nur Ramilevich
  • Sadrutdinov Rashit Radikovich
  • Valeev Marat Davletovich
RU2533468C1
OIL WELL OPERATION METHOD BY THE ELECTRIC CENTRIFUGAL PUMP UNIT 2017
  • Gareev Adib Akhmetnabievich
RU2677313C1
METHOD OF "GAS-LIFT AND SUBMERGED PUMP" COMBINED AGGREGATE OPERATION 1992
  • Leonov V.A.
  • Sal'Manov R.G.
  • Prokhorov N.N.
  • Tajushev A.V.
  • Grekhov V.V.
  • Fonin P.N.
RU2068492C1
METHOD OF HYDRO-DYNAMIC SURVEY IN WELL EQUIPPED WITH ELECTRIC-CENTRIFUGAL PUMP INSTALLATION 2007
  • Nikonov Andrej Nikolaevich
  • Puzikov Valerij Ivanovich
RU2370635C2
METHOD OF SUPER-VISCOUS OIL FIELD DEVELOPMENT 2017
  • Amerkhanov Marat Inkilapovich
  • Akhmadullin Robert Rafaelovich
  • Akhmetzyanov Fanil Muktasimovich
  • Akhmetshin Nail Munirovich
  • Beregovoj Anton Nikolaevich
RU2690588C2
METHOD FOR NON-STATIONARY EXTRACTION OF OIL FROM BED 2004
  • Belov Vladimir Grigor'Evich
  • Gorshenin Andrej Jur'Evich
  • Ivanov Vladimir Anatol'Evich
  • Kozlovskij Vladimir Sergeevich
  • Musaev Khasan Tsitsoevich
  • Fedoseev Anatolij Ivanovich
  • Shelekhov Aleksandr Leonidovich
RU2288352C2
PROCEDURE FOR OPERATION OF WELL EQUIPPED WITH ELECTRO-CENTRIFUGAL PUMP PLANT WITH VARIABLE-FREQUENCY DRIVE 2010
  • Latypov Al'Bert Rifovich
  • Shajakberov Valerij Fajazovich
  • Ismagilov Rinat Rafaehlevich
  • Latypov Irek Abuzarovich
  • Shajakberov Ehduard Valer'Evich
RU2421605C1

RU 2 475 640 C2

Authors

Galaj Mikhail Ivanovich

Demjanenko Nikolaj Aleksandrovich

Manujlo Vasilij Sergeevich

Shubenok Julija Ivanovna

Mulitsa Stanislav Iosifovich

Dates

2013-02-20Published

2011-03-25Filed