FIELD: electricity.
SUBSTANCE: in a distribution region a substation (3) of the region with a distribution controller (19) is applied, or an Intelligent Substation Control System (ISCS). The distribution controller is connected with many devices (21) of technological processes, which in their turn are connected with main devices (23) of the region. Devices of technological processes send data corresponding to the main devices into the distribution controller, and the distribution controller comprises facilities (29) of data processing, which propose a set of operations on the basis of the received data. Besides, the distribution controller comprises coordination facilities (33), which select a final operation from a set of proposed operations. The final operation is performed by main devices of the energy distribution region.
EFFECT: higher efficiency and optimisation of energy distribution.
7 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
POWER DISTRIBUTION CONTROL | 2009 |
|
RU2450406C1 |
METHOD OF CONTROLLING RAILWAY POWER SUPPLY SYSTEM | 2015 |
|
RU2587128C1 |
SYSTEM LEVEL TESTING FOR SUBSTATION AUTOMATION SYSTEMS | 2007 |
|
RU2402784C2 |
ANALYSING COMMUNICATION CHARACTERISTICS OF INTELLIGENT ELECTRONIC DEVICE (IED) | 2010 |
|
RU2440685C1 |
MALICIOUS ATTACK DETECTION AND ANALYSIS | 2011 |
|
RU2583703C2 |
METHOD AND APPARATUS FOR COORDINATING FUNCTION SELF OPTIMISATION IN WIRELESS NETWORK | 2013 |
|
RU2596799C2 |
CONTROL AND MONITORING DEVICE OF CUBICLE SWITCHBOARD CELL | 2011 |
|
RU2454772C1 |
METHOD AND DEVICE FOR THE SELF OPTIMIZATION IN WIRELESS NETWORK FUNCTION COORDINATING | 2016 |
|
RU2656149C2 |
METHOD AND SYSTEM FOR REMOTE MEASUREMENT OF POWER, WATER OR GAS CONSUMPTION | 2009 |
|
RU2502051C2 |
SYSTEM AND METHOD, PROVIDING DISTRIBUTED WELDING ARCHITECTURE | 2002 |
|
RU2284885C2 |
Authors
Dates
2013-04-10—Published
2008-07-17—Filed