FIELD: oil and gas industry.
SUBSTANCE: method involves perforation of two productive intervals, lowering to the well of a layout consisting (in an upward direction) of a setting device, a shank, a packer located below upper productive interval, a pipe string with a drain valve on the level of upper productive interval, and on the head with a tee-piece with a cutoff branch and a cutoff branch pipe above the tee-piece, packer setting, swabbing in the pipe string of lower productive formation, build-up of a recovery curve of a level for lower productive formation, evaluation of productivity of lower productive formation; filling of the layout with water after swabbing of lower productive formation through the tap and the tee-piece; waiting till water goes downwards and air upwards; air bleeding through a branch pipe, repetition of operations till the layout is filled with water; lowering to the pipe string and arrangement in the setting device of a cutoff device' creation of pressure in the pipe string and opening of the drain valve' swabbing in the pipe string of upper productive formation; build-up of a recovery curve of the level for upper productive formation; evaluation of productivity of upper productive formation, lifting of the layout out if the well, lowering of a downhole pumping equipment and operation of the well.
EFFECT: possible development of the well opening two productive formations without lowering and lifting operations for development of the second formation.
2 cl, 1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SEALING A PRODUCTION STRING | 2017 |
|
RU2669646C1 |
WELL BOTTOMHOLE ZONE TREATMENT METHOD | 2015 |
|
RU2601960C1 |
METHOD OF WELL OPERATION | 2007 |
|
RU2335622C1 |
METHOD OF PROCESS WELL TREATMENT | 2015 |
|
RU2600137C1 |
METHOD FOR GENERATION OF DRAW-DOWN PRESSURE IN ORDER TO CONDUCT BOREHOLE INVESTIGATIONS | 2011 |
|
RU2490446C1 |
WELL DEVELOPMENT METHOD AFTER TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2018 |
|
RU2698354C1 |
METHOD FOR WELL DEVELOPMENT AND OPERATION AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2503798C2 |
WELL DEVELOPMENT AND OPERATION METHOD AND CONFIGURATION OF DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION | 2014 |
|
RU2559999C2 |
METHOD OF PRODUCTION STRING SEALING | 2012 |
|
RU2513793C1 |
DEVELOPMENT METHOD OF MULTI-HOLE BRANCHED HORIZONTAL WELLS | 2011 |
|
RU2459945C1 |
Authors
Dates
2013-05-27—Published
2012-07-23—Filed