FIELD: metallurgy.
SUBSTANCE: rail from high-carbon pearlite steel, which has increased ductility, which contains the following components, wt %, is proposed: C: more than 0.85 to 1.40%, Si: 0.10%-2.00%, Mn: 0.10%-2.00%, Ti: 0.001%-0.01%, V: 0.005%-0.20%, N: less than 0.0040%, Fe and inevitable impurities are the rest. Contents of Ti and V meet the following formula: 5≤[V(wt %)]/[Ti(wt %)]≤20. Head part of the rail has pearlite structure. Method for obtaining pearlite rail involves hot rolling of bloom, finishing rolling of the hot rolling stage under conditions when temperature of finishing rolling FT, °C is established in the following range: Tc-25≤FT≤Tc+25. Tc=850+35×[C]+1,35×104x[Ti]+180×[V].
EFFECT: rails have increased ductility and wear resistance.
3 cl, 10 dwg, 5 tbl, 15 ex
Title | Year | Author | Number |
---|---|---|---|
RAILS FROM PEARLITE STEEL WITH EXCELLENT WEAR RESISTANCE AND IMPACT STRENGTH | 2010 |
|
RU2485201C2 |
RAIL WITH PERLITE STRUCTURE THAT FEATURES HIGH RESISTANCE TO ABRASION AND IMPACT RESISTANCE | 2009 |
|
RU2461639C1 |
MANUFACTURING METHOD OF PEARLITE RAIL WITH EXCELLENT WEAR RESISTANCE AND DUCTILITY | 2007 |
|
RU2400543C1 |
PRODUCTION OF HYPEREUTECTIC STEEL RAIL WITH QUENCHED HEAD | 2010 |
|
RU2579319C2 |
RAIL | 2016 |
|
RU2666811C1 |
STEEL RAIL AND METHOD OF ITS PRODUCTION | 2011 |
|
RU2519180C1 |
RAIL | 2016 |
|
RU2676374C1 |
RAIL FROM PERLITIC STEEL WITH HIGH WEAR RESISTANCE AND METHOD OF RAIL MANUFACTURE | 1995 |
|
RU2112051C1 |
HIGH-STRENGTH COLD-ROLLED STEEL PLATE WITH IMPROVED ABILITY FOR LOCAL DEFORMATION, AND ITS MANUFACTURING METHOD | 2012 |
|
RU2551726C1 |
PEARLITE RAILS | 2010 |
|
RU2476617C1 |
Authors
Dates
2013-07-27—Published
2010-04-14—Filed