FIELD: construction.
SUBSTANCE: to withdraw a damaged screw from a dowel of a reinforced concrete sleeper, foreign objects are removed from the dowel cavity. Further a conductor is installed onto the sleeper, it is fixed in the dowel cavity and to the foot of the railway rail, two holes are drilled according to the conductor in the screw body with eccentricity relative to the screw axis. Then an extractor is inserted into the oval opening produced in the screw body, and the damaged screw is removed from the dowel. Shape and size of the working tip of the extractor correspond to the produced oval opening.
EFFECT: possibility to apply a considerable torque required for removal of a damaged screw, by elimination of extractor slipping in a screw body, which increases reliability of this method.
8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO REPAIR SLEEPERS AND SET OF TOOLS FOR ITS REALISATION (VERSIONS) | 2009 |
|
RU2444587C2 |
METHOD FOR RESTORING THE CONCRETE BASE OF A RAIL TRACK | 2020 |
|
RU2750011C1 |
METHOD OF SLEEPER REPAIR | 2009 |
|
RU2400591C1 |
DEVICE FOR REPAIRING THE CONCRETE BASE OF THE TRACK (OPTIONS) | 2020 |
|
RU2750008C1 |
SLEEPER FOR HIGH-SPEED RAIL TRACKS | 2018 |
|
RU2719745C2 |
DOWEL FASTENING RAILS TO REINFORCED CONCRETE SLEEPERS (OPTIONS) | 2022 |
|
RU2788503C1 |
RAIL FASTENING | 2021 |
|
RU2767112C1 |
RAILWAY TRACK LINK | 2017 |
|
RU2657709C1 |
REINFORCED CONCRETE SLEEPER FOR INSULATING JOINTS OF SIGNAL CURRENT OF RAIL CIRCUITS WITH PULSE SUPPLY (VERSIONS) | 2018 |
|
RU2700249C1 |
FIXING BLOCK FOR SECURING DIAGRAM OF SLEEPERS OF RAILWAY TRACK FOR HIGH-SPEED NETWORKS, LONG-DISTANCE AND HEAVY TRAIN TRAFFIC | 2020 |
|
RU2751167C1 |
Authors
Dates
2013-09-20—Published
2011-04-01—Filed