FIELD: oil and gas industry.
SUBSTANCE: assembly consists of an electrical centrifugal pump mounted on a faceplate located on a flange of a production casing, lower and upper packers mounted above lower and upper beds, two well bores in the upper packer one inside the other to form two independent channels, and a valve assembly above the upper packer provided with a control element. The valve assembly comprises two control discs on a rod, a mixing chamber in between, and a disc rotation mechanism containing springs, a slide valve and a rod. The control disks comprise circumferential throttle holes of various diameters. The control element represents a hydraulic tube connecting the valve assembly with a pump discharge head.
EFFECT: more effective operation of the assembly ensured by optimising the modes of liquid sampling and using the same control element.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION | 2013 |
|
RU2531011C1 |
METHOD FOR UNDERGROUND WELL REPAIR FOR REPLACEMENT OF DOWNHOLE PUMPING EQUIPMENT WITHOUT ACTION ON FORMATION | 2015 |
|
RU2592903C1 |
METHOD FOR UNDERGROUND WELL REPAIR TO REPLACE SUBMERSIBLE EQUIPMENT AND EXCLUDE INFLUENCE OF WELL-KILLING FLUID ON PRODUCTIVE PLAST | 2016 |
|
RU2623750C1 |
PUMP UNIT FOR BEDS IN WELL OPERATION | 2015 |
|
RU2604897C1 |
PUMP UNIT FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO WELL FORMATIONS | 2018 |
|
RU2699502C1 |
SUBMERSIBLE PUMPING UNIT FOR PUMPING LIQUID | 2019 |
|
RU2725202C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SEQUENTIAL PRODUCTION OF FORMATION FLUID IN WELLS OF MULTILAYER FIELDS WITH USE OF DOWNHOLE DISCONNECTABLE WET CONTACT UNIT | 2011 |
|
RU2500882C9 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
METHOD OF BOREHOLE TRANSFER AND UNIT FOR TRANSFER OF LIQUID FROM UPPER WELL FORMATION TO LOWER ONE WITH FILTRATION | 2011 |
|
RU2485293C1 |
EQUIPMENT FOR MULTI-RESERVOIR WELL SUMULTANIOUS-SEPARATE RECEARCH AND PRODUCTION WITH ELECTIRCAL SUBMERSIBLE PUMP (VERSIONS) | 2008 |
|
RU2380522C1 |
Authors
Dates
2013-09-20—Published
2012-03-22—Filed