FIELD: oil-and-gas industry.
SUBSTANCE: proposed plant comprises short and long tubing, eccentric stabiliser arranged at long tuning, parallel anchor, downhole instruments located above and under packer, geophysical cable fixed at eccentric stabiliser by locks and cable tight adapter. Note here that eccentric stabilisers feature hemispherical grooves with chamfers and are nor attached to tubing. This allows it to turn about axis but it is locked by rings in lengthwise direction. Top and bottom downhole instruments are interconnected via one geophysical cable while well filter is connected to packer. Short tubing is passed via eccentric guides by hemispherical chamfered grooves.
EFFECT: higher reliability, simplified assembly.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO WELL FORMATIONS | 2019 |
|
RU2720716C1 |
UNIT FOR DUAL BED OPERATION IN ONE CHINK | 2009 |
|
RU2387809C1 |
METHOD AND DEVICE FOR ACCIDENT-FREE RUNNING OF GEOPHYSICAL EQUIPMENT | 2013 |
|
RU2536077C1 |
DUAL TUBING INSTALLATION FOR SELECTIVE COMPLETION OF TWO RESERVOIRS BY ONE WELL | 2022 |
|
RU2790622C1 |
DEVICE FOR DUAL INJECTION OPERATION TO TWO FORMATIONS OF SAME WELL (VERSIONS) | 2013 |
|
RU2517294C1 |
METHOD FOR DETERMINATION OF TIGHTNESS OF DOWNHOLE EQUIPMENT FOR SIMULTANEOUS SEPARATE OPERATION | 2019 |
|
RU2720727C1 |
METHOD OF DETERMINING AIR-TIGHTNESS OF DOWNHOLE EQUIPMENT WITH DUAL EXTRACTION OF FLUIDS FROM WELL WITH SUCKER-ROD AND ELECTRIC-CENTRIFUGAL PUMP | 2015 |
|
RU2589016C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
METHOD FOR STUDYING DIRECTIVE AND HORIZONTAL WELLS DURING PUMPING OPERATION | 2023 |
|
RU2810764C1 |
SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) | 2014 |
|
RU2571790C1 |
Authors
Dates
2013-11-20—Published
2012-03-27—Filed