DUAL TUBING INSTALLATION FOR SELECTIVE COMPLETION OF TWO RESERVOIRS BY ONE WELL Russian patent published in 2023 - IPC E21B43/14 

Abstract RU 2790622 C1

FIELD: tubing production.

SUBSTANCE: dual tubing installation for selective completion of two reservoirs by one well includes the main and additional drives. The installation contains a packer installed between the upper and lower reservoirs. The installation includes main tubing string, connected with the below-packer space of the well, and additional tubing string, connected with the behind-the-packer space of the well, tubing strings are with rod pumps. The tubing strings are fixed to the wellhead with double-hole fittings. A parallel anchor is installed on the main tubing string. Below the parallel anchor, at the inlet of the additional tubing string, there is a sand anchor with a tubing container and a spherical plug. The spherical plug has a thread in the upper part for connection to the tubing of the container and its sealing for the mechanical impurities accumulation. The parallel anchor is made in the form of a hemicylindrical body with a longitudinal channel that provides fixation of the main tubing string. A longitudinal hemispherical groove with rounded corners is made on the inner surface of the parallel anchor.

EFFECT: simplification of the design and enhancement of the reliability of the dual tubing installation for selective completion of two reservoirs by one well, protection against clogging by mechanical impurities, maintenance simplification, elimination of possibility of twisting an additional tubing string, reduction of the repair duration.

1 cl, 2 dwg

Similar patents RU2790622C1

Title Year Author Number
DOUBLE-TUBING STRING INSTALLATION FOR DUAL OPERATION OF TWO STRATA WITH ONE WELL 2014
  • Arslanov Dinar Damirovich
  • Galimov Radik Rastjamovich
  • Vanjurikhin Igor' Stepanovich
  • Legaev Jurij Nikolaevich
  • Pishchaev Dmitrij Vadimovich
RU2566844C1
INSTALLATION FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS BY ONE WELL IN CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION 2024
  • Belov Aleksandr Evgenevich
RU2826680C1
INSTALLATION OF SUCKER-ROD PUMP WITH PARALLEL PIPE STRINGS FOR OPERATION OF WELLS WITH INCREASED SAND PRODUCTION 2023
  • Bragin Dmitrii Viktorovich
  • Zairov Bulat Foatovich
  • Basos Georgii Iurevich
RU2815669C1
UNIT FOR SIMULTANEOUS SEPARATE PRODUCTION AND INJECTION UNDER CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION 2023
  • Belov Aleksandr Evgenevich
RU2819182C1
DOWHNOLE PUMP UNIT FOR SIMULTANEOUS AND SEPARATE OPERATION OF TWO FORMATIONS 2014
  • Nikolaev Oleg Sergeevich
RU2542999C2
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION 2012
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
  • Shamilov Faat Takhirovich
RU2515630C1
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) 2011
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2464413C1
METHOD OF ONE WELL TWO RESERVOIRS SIMULTANEOUSE PRODUCTION USING PUMPING EQUIPMENT WITH DRIVE LOCATED ON WELLHEAD 2008
  • Parijchuk Nikolaj Ivanovich
RU2380524C1
DOWNHOLE PUMPING UNIT WITH SAND FILTER 2022
  • Akhmetshin Ruslan Alfredovich
RU2784705C1
DOWNHOLE PUMPING UNIT WITH BACKWASH CLEANING 2023
  • Nurullin Ilnar Zagfiarovich
  • Tagirov Rustam Islamovich
RU2802634C1

RU 2 790 622 C1

Authors

Belov Aleksandr Evgenevich

Dates

2023-02-28Published

2022-09-13Filed