UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO WELL FORMATIONS Russian patent published in 2020 - IPC E21B43/14 

Abstract RU 2720716 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to oil industry and can be used at simultaneous separate operation of two well formations. Plant for simultaneous separate operation of two well formations comprises a well head, a long flow column, a main sucker-rod pump, a packer separating upper and lower formations, additional pumping unit and a short riser pipe installed above the upper productive formation, and a parallel anchor installed on both columns of flow tubes and above the upper productive formation. Short column of tubing is equipped with an additional sucker-rod pump, and the main and additional sucker-rod pumps are plug-in ones, at that reception of each of them is interconnected by borehole space through shank with filter. Mesh filter in shank located under packer is fixed with bottom clearance down blind cup with radial channels, inside which there is a hollow sleeve with spring-loaded upward and with narrowing inside, installed with possibility of longitudinal movement and hermetic overlapping of radial channels of the cartridge in upper position. Main pump from below is equipped with pusher configured to interact with sleeve contraction and its displacement downward relative to sleeve to open radial channels before fixation in packer.

EFFECT: technical result consists in possibility of quick separation of formations after extraction of main pump from packer installed between formations.

1 cl, 2 dwg

Similar patents RU2720716C1

Title Year Author Number
DUAL TUBING INSTALLATION FOR SELECTIVE COMPLETION OF TWO RESERVOIRS BY ONE WELL 2022
  • Belov Aleksandr Evgenevich
RU2790622C1
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION 2012
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
  • Shamilov Faat Takhirovich
RU2515630C1
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS IN WELL WITH INCREASED GAS FACTOR 2024
  • Akhmetshin Ruslan Alfredovich
RU2825381C1
BOREHOLE PUMPING UNIT FOR TWO RESERVOIRS SIMULTANEOUSE PRODUCTION 2008
  • Parijchuk Nikolaj Ivanovich
RU2381352C1
OIL WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO RESERVOIRS 2009
  • Parijchuk Nikolaj Ivanovich
  • Nagumanov Marat Mirsatovich
  • Aminev Marat Khusnullovich
RU2405925C1
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) 2011
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2464413C1
INSTALLATION FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS BY ONE WELL IN CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION 2024
  • Belov Aleksandr Evgenevich
RU2826680C1
METHOD OF ONE WELL TWO RESERVOIRS SIMULTANEOUSE PRODUCTION USING PUMPING EQUIPMENT WITH DRIVE LOCATED ON WELLHEAD 2008
  • Parijchuk Nikolaj Ivanovich
RU2380524C1
DOUBLE-TUBING STRING INSTALLATION FOR DUAL OPERATION OF TWO STRATA WITH ONE WELL 2014
  • Arslanov Dinar Damirovich
  • Galimov Radik Rastjamovich
  • Vanjurikhin Igor' Stepanovich
  • Legaev Jurij Nikolaevich
  • Pishchaev Dmitrij Vadimovich
RU2566844C1
METHOD FOR SIMULTANEOUS AND SEPARATE DEVELOPMENT OF TWO AND MORE FORMATIONS, AND PLANT FOR ITS IMPLEMENTATION 2011
  • Aleksandrov Petr Olegovich
  • Voskobojnikov Andrej Anatol'Evich
RU2509876C2

RU 2 720 716 C1

Authors

Rizatdinov Rinat Faritovich

Kaiumov Robert Rafailevich

Osnos Vladimir Borisovich

Dates

2020-05-13Published

2019-09-30Filed