Abstract RU 2799221 C1

FIELD: oil industry.

SUBSTANCE: invention relates to the simultaneous separate operation of several productive layers of one well by pumping units. A pumping unit is claimed, including a downhole pump controlled from the wellhead, a string of lift pipes, a sand anchor at the pump intake, a packer installed above the upper formation and connected to the sand anchor container through a perforated pipe. At the same time, a non-return valve is installed between the perforated pipe and the packer, and additional upper sand anchors with a container are installed below the packer. From below, at least one additional lower packer installed between the exposed layers, the lower additional sand anchor with the lower container are connected in series to the container of the additional upper anchor through an additional perforated pipe. An additional check valve is installed inside the corresponding additional perforated pipe and the packer. Above each packer, below the corresponding check valve, a cuff is installed from the outside, protecting the packer from sedimented mechanical impurities and sand. And above each check valve there is a protective cup with side holes, which ensures the exclusion of sedimentation of mechanical impurities and sand on the check valve, while the flow rate of the fluid produced by the well pump outside the cup is greater than the flow rate inside the cup. The well pump has a capacity not less than the total productivity of all layers to ensure the possibility of exploiting all the layers penetrated by the well. Additional check valves are controlled, with the opening pressure that makes it possible to exclude fluid overflows from the lower reservoir to the upper one when the well pump is idle.

EFFECT: creation of a pumping unit for the operation of formations complicated by sand production, with formation pressure growing from the bottom up, which makes it possible to expand the scope of application due to the possibility of operating several formations, excluding the deposition of mechanical impurities and sand from above on the check valves and the packer and, as a result, carrying out continuous production of products from all layers, as well as allowing for trouble-free removal of the packers of the device when removing the pumping unit from the well.

1 cl, 1 dwg

Similar patents RU2799221C1

Title Year Author Number
INSTALLATION OF SUCKER-ROD PUMP WITH PARALLEL PIPE STRINGS FOR OPERATION OF WELLS WITH INCREASED SAND PRODUCTION 2023
  • Bragin Dmitrii Viktorovich
  • Zairov Bulat Foatovich
  • Basos Georgii Iurevich
RU2815669C1
DOWNHOLE PUMPING UNIT WITH SAND FILTER 2022
  • Akhmetshin Ruslan Alfredovich
RU2784705C1
DOWNHOLE PUMPING UNIT WITH BACKWASH CLEANING 2023
  • Nurullin Ilnar Zagfiarovich
  • Tagirov Rustam Islamovich
RU2802634C1
LAYOUT OF DOWNHOLE EQUIPMENT FOR MECHANIZED OIL PRODUCTION WITH MECHANICAL IMPURITIES 2022
  • Pokazanev Konstantin Vladimirovich
  • Latfullin Rustem Ruslanovich
  • Pakshin Iurii Gennadevich
RU2782663C1
METHOD FOR PROTECTION OF DOWN-HOLE WELL PUMPS FROM CONTAMINATION WITH MECHANICAL IMPURITIES AND POURING OF BOTTOMHOLE AND WELL PERFORATION INTERVAL 2020
  • Malykhin Igor Aleksandrovich
RU2742388C1
METHOD FOR INCREASING INJECTIVITY OF INJECTION WELL FORMATION 2023
  • Galimov Rustem Irekovich
  • Surkov Nikolai Aleksandrovich
RU2813875C1
DEVICE AND METHOD FOR UNDERGROUND WELL COMPLETION 2005
  • Patel Dinesh R.
RU2307920C1
METHOD OF TWO RESERVOIRS SUMULTANIOUS-SEPARATE PRODUCTION 2008
  • Parijchuk Nikolaj Ivanovich
RU2380525C1
STORAGE HOLD 2010
  • Chigrjaj Vladimir Aleksandrovich
  • Pashkov Anatolij Mikhajlovich
RU2447263C1
PUMPING-EJECTOR PLANT FOR DOWNHOLE FLUID TRANSFER FROM LOWER TO UPPER FORMATION 2019
  • Nikolaev Oleg Sergeevich
RU2718553C1

RU 2 799 221 C1

Authors

Nuriakhmetov Lenar Nafisovich

Dates

2023-07-04Published

2023-02-10Filed