FIELD: mining.
SUBSTANCE: protective shield creation method at driving of a tunnel under earth fill consists in stepped forcing of tubular sections and excavation of rock from them. Prior to the next section forcing, a sector is cut out in the preceding section from its inner cavity by the value of a forcing step and the forces section is installed in the above cut-out. Each section is made in the form of tubes with cut-out sectors within 90÷120 degrees and connected to each other on edges of the cut-out sectors.
EFFECT: improvement of hygienic and sanitary operating conditions of a shield in the section at simultaneous reduction of metal consumption for a process.
7 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD OF TUNNEL CONSTRUCTION | 2016 |
|
RU2623397C1 |
| PROTECTIVE SCREEN | 2018 |
|
RU2682272C1 |
| TUNNEL AND METHOD OF ITS ERECTION | 2013 |
|
RU2558551C2 |
| CULVERT PIPELINE SYSTEM | 2018 |
|
RU2682278C1 |
| TUNNEL CONSTRUCTION METHOD AND SEGMENTS FOR THIS TUNNEL CONSTRUCTION | 2019 |
|
RU2718449C1 |
| METHOD OF UPDATING OF UNDERGROUND TRANSPORTATION STRUCTURE | 2001 |
|
RU2181418C1 |
| TUNNEL DRIVING METHOD | 2005 |
|
RU2301339C1 |
| TUNNEL AND METHOD OF ITS CONSTRUCTION | 2019 |
|
RU2710832C1 |
| METHOD OF CONTROL AND RELIEF OF PASSENGER, FREIGHT-PASSENGER AND FREIGHT TRAFFICS OF URBAN TRANSPORT COMPLEX | 2001 |
|
RU2181399C1 |
| TUNNEL FROM CELLULAR AND BOX-SHAPED TONGUE-AND-GROOVE STRUCTURES | 2014 |
|
RU2550608C1 |
Authors
Dates
2013-12-20—Published
2012-05-14—Filed