FIELD: radio engineering, communication.
SUBSTANCE: result is achieved due to an intelligent electronic device (IED), equipped for automating a substation such as a switchboard unit or personal computer substation, having a central processing unit (CPU) which includes a first processing core designed for and configured to run a security and control application, and a second processing core or a network core, designed for and configured to process or decode the data transmission network schedule; in the preferred version, the network core executes high-computational volume functions for preliminary or subsequent processing in the top part of the data transmission stack 9-2; a plurality of network cores or a plurality of network interfaces can be used to enable operation with the expected traffic volume IEC 61850 9-2.
EFFECT: continuous processing of network traffic owing to separation of security and control functional capabilities in intelligent electronic devices from data transmission tasks, and the former does not hinder the latter.
8 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
USING TRANSMISSION TIME AS MEANS OF INCREASING ACCURACY OF SIMPLE NETWORK TIME PROTOCOL | 2006 |
|
RU2433559C2 |
CENTRALIZED INTELLIGENT ELECTRONIC DEVICE OF AUTOMATED ELECTRICAL SUBSTATION SYSTEM | 2019 |
|
RU2720318C1 |
ANALYSING COMMUNICATION CHARACTERISTICS OF INTELLIGENT ELECTRONIC DEVICE (IED) | 2010 |
|
RU2440685C1 |
INSPECTION OF INTELLIGENT ELECTRONIC DEVICE CONFIGURATION | 2007 |
|
RU2431913C2 |
SYSTEM LEVEL TESTING FOR SUBSTATION AUTOMATION SYSTEMS | 2007 |
|
RU2402784C2 |
DATA BLOCK TRANSMISSION AND COMMUNICATION NETWORK | 2011 |
|
RU2534931C2 |
PROTECTED CLOCK SYNCHRONISATION | 2011 |
|
RU2487382C1 |
INSPECTION OF INTELLIGENT ELECTRONIC DEVICE CONFIGURATION | 2007 |
|
RU2427871C2 |
AUTOMATION SYSTEM WITH DYNAMIC FUNCTIONAL ARCHITECTURE | 2018 |
|
RU2679739C1 |
CONTROL PANEL FOR EMERGENCY SYSTEM | 2014 |
|
RU2669517C2 |
Authors
Dates
2014-01-20—Published
2009-12-22—Filed