FIELD: machine building.
SUBSTANCE: bent pipeline length repair comprises opening the trench over the length of stability local loss section, restoring the pipeline load-carrying ability and decreasing stress at faulty section. Restoring the pipeline load-carrying ability, decreasing stress at faulty section and preventing further destruction of pipeline even outside of faulty section at repeated origination of axial forces are performed by cutting the damaged pipeline length. Then, flexible metallic pipeline is drawn into strained length to connect said pipeline to both end of repaired pipeline and installing protective jacket.
EFFECT: lower labour input, simplified process, higher reliability.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIR OF PIPE LINE DEFORMED BY FLEXIBLE STRAIN | 1994 |
|
RU2076988C1 |
REPAIR METHOD FOR PREDOMINANTLY EXTENDED UNSTRAIGHT PIPELINE | 2006 |
|
RU2339864C2 |
METHOD FOR REPAIRING METALLIC PIPELINES | 1999 |
|
RU2155905C2 |
METHOD OF REPAIRING SLUGGED OR ERODED SECTION OF PIPELINE | 2004 |
|
RU2285186C2 |
METHOD FOR REPAIRING DEFECTIVE SECTIONS OF MAIN PIPELINES | 2022 |
|
RU2791795C1 |
METHOD OF REPAIR OF PIPE LINE DEFORMED BY BENDING | 1997 |
|
RU2134373C1 |
REPAIR METHOD OF DEFECTIVE PIPELINE SECTIONS IN TRENCH | 2016 |
|
RU2708758C2 |
METHOD FOR PIPELINE RESTORATION AND DEVICE FOR IMPLEMENTATION THEREOF | 2015 |
|
RU2601782C1 |
REPAIR OF POTENTIALLY DANGEROUS PIPELINE SECTION | 2013 |
|
RU2554172C2 |
METHOD OF PIPELINE REPAIR | 2012 |
|
RU2493472C1 |
Authors
Dates
2014-01-27—Published
2012-04-27—Filed