FIELD: mining.
SUBSTANCE: proposed method comprises stockpile filling of dumping site stages. Note here that dumping site stage comprising rocks of capping and pasty tails are laid separately towards each other. Note also that pasty tails are laid on slope side Note that stockpile filling of dumping site stages and pasty tails I performed to one horizontal level.
EFFECT: filling of dumping sire stages in single turn, pilling of pasty tails after ore dressing redistribution at inclined base.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DUMPING ONTO INCLINED BASE | 2012 |
|
RU2507397C1 |
METHOD OF DUMPING AT OPEN MINING OF MINERAL DEPOSITS | 2012 |
|
RU2509891C1 |
METHOD OF DUMPING AT OPEN DEVELOPMENT OF MINERAL DEPOSITS | 2015 |
|
RU2604072C1 |
METHOD FOR OPEN-CUT MINING OF MINERAL DEPOSITS | 2017 |
|
RU2642903C1 |
METHOD OF OPEN MINING OF MINERAL DEPOSITS WITH FORMING OF DUMP WITH LARGE VOLUME AND HEIGHT IN DIFFICULT CONDITIONS | 2011 |
|
RU2543765C2 |
DUMPING METHOD DURING DEVELOPMENT OF UPLAND QUARRIES | 2017 |
|
RU2658420C1 |
METHOD OF DUMPING ON INCLINED BASE | 2002 |
|
RU2211333C1 |
METHOD FOR FORMATION OF HILLSIDE ROCK DUMPS | 1991 |
|
RU2039266C1 |
METHOD OF STRIP MINING OF STEEP DEPOSITS | 0 |
|
SU1155755A1 |
METHOD OF ROCKS STORING INTO DUMP ON SLOPES IN STAGE MINING OF HIGHLAND DEPOSITS | 2001 |
|
RU2194859C2 |
Authors
Dates
2014-06-27—Published
2013-03-06—Filed