FIELD: construction.
SUBSTANCE: reinforced concrete plates installed on road bed are attached to piles. Between plates on road bed there is a sand layer. The sand layer is covered with bottoming. Between hard strips on bottoming there is an asphalt-concrete layer. In spring plates prevent water from sand washing-out. Automobile road will be in good condition for a long period of time. Automobile road of proposed structure will not need repair for a long period of time.
EFFECT: reducing expenses on the road operation.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
MOTOR ROAD | 2016 |
|
RU2635683C1 |
AUTOMOBILE ROAD | 2020 |
|
RU2734184C1 |
MOTOR ROAD | 2023 |
|
RU2800165C1 |
METHOD OF ROAD CONSTRUCTION BROADENING | 2016 |
|
RU2632834C2 |
AUTO-ROAD | 2021 |
|
RU2755102C1 |
COUNTRY ROAD | 2017 |
|
RU2675263C1 |
ROAD PAVEMENT FOR MOTOR ROADS AND AERODROME PAVEMENTS | 2011 |
|
RU2473728C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR RECONSTRUCTION OF MEGAPOLICE RING HIGHWAY | 1998 |
|
RU2135672C1 |
METHOD OF REPAIR OF ROAD SURFACING | 2009 |
|
RU2405081C1 |
DEVICE FOR SUBGRADE OF HIGH-SPEED IN AREAS WITH DEVELOPMENT OF KARST-SUFFUSION PROCESSES | 2018 |
|
RU2681179C1 |
Authors
Dates
2014-02-27—Published
2012-10-11—Filed