FIELD: construction.
SUBSTANCE: invention relates to the field of construction, namely, to methods of repair of subway tunnels arranged in complicated mining and geological conditions. The method to reinforce defective lining of the tunnel, which was subject to subsidence due to unstable and waterlogged base, consists in strengthening of a track bed and lining of the tunnel. Strengthening of the track bed and lining of the tunnel is carried out by resting a track bed onto a layer of underlying dense soils, arranged at the depth under the layer of unstable and waterlogged soil. The support of the tunnel lining onto the layer of underlying dense soils is carried out by arrangement of rows of soil and cement piles, the head of which is fixed in a concrete base of the track bed, and the base is arranged in the layer of underlying dense soils.
EFFECT: provision of performance of repair works for strengthening of a track bed and tunnel lining without disturbance of subway operation and schedule of train movement, in increased bearing capacity.
4 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS | 2020 |
|
RU2739880C1 |
METHOD OF CONSTRUCTION OF LINE OF SUBWAY OF SHALLOW DEPTH | 0 |
|
SU1794193A3 |
METHOD FOR STRENGTHENING STRUCTURALLY UNSTABLE SOILS WITH KARST FORMATIONS AND/OR WATER-SATURATED SOILS USING MICROPILES AND INJECTORS FOR FORMING MICROPILES | 2022 |
|
RU2795924C2 |
TUNNEL DESIGN | 2001 |
|
RU2181413C1 |
METHOD OF CONSTRUCTION OF UNDERGROUND WORKINGS IN UNSTABLE WATER-SATURATED GROUNDS | 1995 |
|
RU2111361C1 |
METHOD FOR CONSTRUCTION OF ESCALATOR CASCADE COMPLEX FOR THE ENTRANCE TO THE METRO STATION, CONSTRUCTED USING CUT-AND-COVER METHOD | 2021 |
|
RU2766876C1 |
METHOD OF CONSTRUCTING TUNNEL UNDER TRAFFIC ARTERIES FOR ORGANISING TRAFFIC INTERSECTIONS AT CROSS-ROADS | 2008 |
|
RU2375522C1 |
PROCESS ISOLATING ZONE OF UNDERGROUND EXCAVATION FROM UNDERGROUND WATER AND METHOD OF MOUNTING OF WATER INLET EQUIPMENT IN TECHNOLOGICAL WELL | 2002 |
|
RU2211894C1 |
METHOD FOR DRIVING TUNNELS IN UNSTABLE WATER-SATURATED ROCKS | 1992 |
|
RU2043501C1 |
METHOD TO REINFORCE SOILS IN BUILDING FOUNDATIONS AND EARTH BED OF LINEAR STRUCTURES ON PERMAFROST SOILS | 2013 |
|
RU2537437C1 |
Authors
Dates
2014-04-10—Published
2012-11-01—Filed