FIELD: transport.
SUBSTANCE: invention relates to railway ACS and telemetry systems. Proposed system comprises train passage planner with memory module including data base on permissible control orders, linear centralisation and automatic interlocking devices and computer-aided trains dispatcher workstation. Additionally, this system comprises control computation complex of the station train radio control system, control computation complex of the system of radio control over trains in transport corridor, station digital radio communication system and track block digital radio communication system.
EFFECT: higher reliability of train traffic control.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
SEMI-AUTOMATIC BLOCKING SYSTEM FOR LENGTH-LIMITED RAILWAY HAULS | 2015 |
|
RU2591554C1 |
STATION DEVICE OF AUTOMATIC SHUNTING LOCOMOTIVE SIGNALING SYSTEM INTEGRATED WITH MICROPROCESSOR-BASED CENTRALIZATION OF A RAILWAY STATION | 2022 |
|
RU2780257C1 |
TRAINS TRAFFIC INTERVAL CONTROL SYSTEM | 2017 |
|
RU2653672C1 |
TRAIN TRAFFIC AUTOMATED CONTROL SYSTEM | 2013 |
|
RU2573260C2 |
SYSTEM FOR CONTROLLING TRAIN MOVEMENT WITH CENTRALISED CONTROL | 2013 |
|
RU2541585C2 |
SYSTEM FOR TRAIN TRAFFIC CENTRALISED DISPATCHING CONTROL | 2008 |
|
RU2387564C1 |
SYSTEM TO CONTROL TRAIN TRAFFIC | 2008 |
|
RU2388637C1 |
DISPATCH CONTROL OVER TRAIN MOTION AT ITS APPROACH TO OCCUPIED TRACK SECTION AND SYSTEM TO THIS END | 2012 |
|
RU2511742C1 |
SEMI-AUTOMATIC BLOCKING SYSTEM FOR LENGTH-LIMITED RAILWAY HAULS | 2015 |
|
RU2591553C1 |
INTELLIGENT COMPLEX FOR THE CONTROL OF THE URBAN RAIL TRANSPORT SYSTEM (URTS) TRANSPORTATION PROCESS | 2022 |
|
RU2791353C1 |
Authors
Dates
2014-04-10—Published
2012-10-23—Filed