METHOD TO CONSTRUCT HIGH-RISE REINFORCED CONCRETE INDUSTRIAL PIPES WITH MULTI-LAYER LINING WITH SMALL OUTLET DIAMETER Russian patent published in 2014 - IPC E04H12/28 

Abstract RU 2518601 C2

FIELD: construction.

SUBSTANCE: pipe is constructed in several stages. At the first stage the pipe shaft is concreted with simultaneous section-by-section build-up of a shaft hoist. Upon completion of pipe shaft concreting the blocks of the cargo cage are rested against a shaft hoist, the working site is dismantled, elements of the tent and device for working site lifting, dimensions of which prevent passage of the device in the assembled form via the outlet diameter of the pipe shaft cut, the dismantled elements are lowered in the cargo cage along the shaft hoist. The device for lifting of the working site is lowered along the shaft hoist down, from which angular stands are dismantled with adjacent crossbars and struts, and flexible links to zero elevation, in partially dismantled angular cells of the shaft hoist they install diagonal crossbars for increasing its stiffness; at the bottom the device is fully dismantled. Movement of the self-lifting device is carried out by four specified hoists as ropes are wound or unwound from hoist drums, at the same time to increase weight-lifting capacity of hoists, the rope of each hoist is directed to the assembly block and is returned to the self-lifting device on the frame. The assembly block with its hook with a latch is suspended onto a ring of a double-branch chain sling, each branch of which is fixed on a quick-detachable yoke, installed on the coupling of the shaft hoist stand. A lining site is suspended to the self-lifting device, from which heat insulation, lining works are performed, as well as anti-corrosion protection. When arranging another layer of lining, during lifting of the self-lifting device they restore flexible links and angular stands, and adjacent crossbars and struts under the lining site. When lowering the device, to prepare for arrangement of another layer under the lining site they dismantle angular stands, crossbars, struts and flexible links. After lining the blocks of the cargo cage are fixed on the cut of the pipe shaft. Cells of the shaft hoist are covered by shields installed onto crossbars, from which it is dismantled to zero elevation. Afterwards the self-lifting device is dismantled.

EFFECT: reduced metal intensity, labour intensiveness, higher quality of works and safety of labour, improved labour conditions.

4 cl, 9 dwg

Similar patents RU2518601C2

Title Year Author Number
METHOD FOR CONSTRUCTION OF HEAT-RESISTANT HIGH-RISE REINFORCED CONCRETE PIPES WITH LOW EXIT DIAMETRE WITH HIGH THICKNESS OF HEAT INSULATION AND LINING OF PIECE MATERIALS 2009
  • Shevljagin Boris Mikhajlovich
  • Frumkin Vjacheslav Moiseevich
  • Shevljagina Natalija Borisovna
RU2405897C1
METHOD TO USE MULTI-BASKET MINE HOIST FOR CONSTRUCTION OF REINFORCED CONCRETE HIGH-RISE PIPES WITH HIGH THICKNESS OF LINING, WITH SMALL OUTPUT DIAMETER AND WITH HIGH RATIO OF OUTLET DIAMETER TO DIAMETER IN BASE 2013
  • Shevljagin Boris Mikhajlovich
RU2544921C1
METHOD OF CONSTRUCTION USING MULTI-CAGE MINE HOIST OF HEIGHT REINFORCED CONCRETE PIPES WITH LARGE THICKNESS OF LINING WITH SMALL OUTLET DIAMETER AND LARGE RATIO OF OUTLET DIAMETER TO DIAMETER IN BASE 2014
  • Shevljagin Boris Mikhajlovich
RU2574226C1
METHOD OF REPAIR AND RECONSTRUCTION OF TALL CHIMNEYS AND PARTIAL DISASSEMBLY OF SHAFT DURING THEIR RECONSTRUCTION 2001
  • Shevljagin B.M.
  • Frumkin V.M.
  • Gavrilov A.I.
  • Zhits G.N.
  • Zinov'Ev A.V.
  • Khod'Ko A.A.
RU2209282C1
METHOD OF CONSTRUCTION OF REINFORCED HIGH-RISE BUILDINGS WITH SMALL INNER DIAMETER, WITH SMALL SLOPE OF TRUNK AND LARGE WALL, FOR EXAMPLE OF SUPPORTING TOWERS AND MASTS 2016
  • Shevlyagin Boris Mikhajlovich
RU2658397C2
PROCESS OF REPAIR AND RECONSTRUCTION OF TALL INDUSTRIAL CHIMNEYS 2001
  • Frumkin V.M.
  • Shevljagin B.M.
  • Zakharov Ju.I.
  • Petrov V.G.
  • Mardukhaev I.N.
RU2209283C1
METHOD OF REPAIR AND RECONSTRUCTION OF HIGH-RISE REINFORCED CONCRETE STRUCTURES WITH VARIABLE TAPER, FOR INSTANCE, COOLING TOWERS AND INDUSTRIAL PIPES 2006
  • Shevljagin Boris Mikhajlovich
  • Frumkin Vjacheslav Moiseevich
RU2334068C2
CONSTRUCTION METHOD OF HIGH-RISE REINFORCED CONCRETE BUILDINGS FOR EXAMPLE WITH INDUSTRIAL PIPES AND TOWERS OF SMALL INNER DIAMETRE 2008
  • Shevljagin Boris Mikhajlovich
  • Frumkin Vjacheslav Moiseevich
  • Shevljagina Natalija Borisovna
RU2380502C1
METHOD OF ERECTING HIGH-RISE REINFORCED CONCRETE STRUCTURES, FOR EXAMPLE, INDUSTRIAL CHIMNEY-STACKS AND TOWERS 2011
  • Shevljagin Boris Mikhajlovich
  • Frumkin Vjacheslav Moiseevich
RU2476653C1
METHOD OF ERECTING HIGH FERROCONCRETE FLUES 0
  • Shevlyagin Boris Mikhajlovich
SU1441038A1

RU 2 518 601 C2

Authors

Shevljagin Boris Mikhajlovich

Frumkin Vjacheslav Moiseevich

Dates

2014-06-10Published

2012-09-26Filed