FIELD: construction.
SUBSTANCE: pipe construction is started from erection of a pipe shaft and installation of lining from one installation of the device for lifting of a working site, at the same time the sequence of pipe shaft concreting and lining installation is performed in two possible versions.
EFFECT: expanded range of typical sizes of constructed pipes to the possibility of their construction with larger lining thickness at small outlet diameter and with large ratio of diameter in a pipe base to outlet diameter with reduced material intensity, prime cost and increased efficiency.