FIELD: construction.
SUBSTANCE: method of construction of reinforced concrete deck intersection with large span includes assembly of prestressed unitised units containing channels, through which reinforcing cables are stretched and then tensioned and channels are injected. Seals are installed on the joined surfaces of prestressed unitised units, reinforcing cables are stretched into the channels of upper and lower shelves of prestressed unitised units, prestressed unitised units are tensioned in two horizontal planes by means of tension of cables, and interunit joints are injected by cement mortar in conjunction with channels.
EFFECT: simplification and reduction of construction time of deck intersection, reduction of labour intensity of installation works, increase of bearing capacity of reinforced concrete vessel deck.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDINGS AND STRUCTURES CEILINGS INSTALLATION | 2007 |
|
RU2338856C1 |
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
METHOD TO MANUFACTURE REINFORCED CONCRETE FRAME OF RESIDENTIAL, PUBLIC, INDUSTRIAL BUILDINGS, GARAGES AND PARKING LOTS | 2011 |
|
RU2473747C2 |
METHOD FOR HIGH-RELIABILITY PRE-STRESSED REINFORCED CONCRETE BUILDING SKELETON PRODUCTION | 2007 |
|
RU2323305C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
PRESTRESSED FERROCONCRETE CONSTRUCTIONS | 1997 |
|
RU2131010C1 |
COMPOSITE LOW VAULT STRUCTURE AND VAULT ERECTION METHOD | 2003 |
|
RU2254424C1 |
METHOD TO MANUFACTURE SLABS IN WOODEN LOW-RISE BUILDINGS | 2011 |
|
RU2478763C1 |
TENDON | 2007 |
|
RU2352737C2 |
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST | 2012 |
|
RU2513574C2 |
Authors
Dates
2014-07-20—Published
2013-05-30—Filed