FIELD: construction.
SUBSTANCE: invention relates to construction, namely to structures, providing fight with landslide events at the facilities of a gas transmission system and other facilities of a industrial infrastructure. A landslide protection work includes a protective wall built of gabions. It is equipped with a telemetry complex consisting of a data collection and transmission unit with an antenna, as well as a device for tracking of the gabion movement, which consists of a column divided into measurement modules, hinges and an anchor, performing the function of fixation of the device due to its installation into the rocks, not subject to landslide phenomena.
EFFECT: technical result consists in providing the controlled state of the wall position, providing the timely solution, excluding the initiation of emergency situations.
1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| LANDSLIDE PROTECTION STRUCTURE | 2011 |
|
RU2498021C2 |
| ANTI-LANDSLIDE PROTECTIVE FACILITY WITH THE INTERACTIVE MONITORING SYSTEM | 2018 |
|
RU2685580C1 |
| LANDSLIDE PROTECTION STRUCTURE | 2012 |
|
RU2531986C2 |
| LANDSLIDE PROTECTION STRUCTURE | 2011 |
|
RU2498020C2 |
| LANDSLIDE PROTECTION STRUCTURE | 2012 |
|
RU2498018C2 |
| SYSTEM FOR MONITORING STRESS-STRAIN STATE OF MAIN PIPELINES | 2014 |
|
RU2568232C2 |
| EXTRACTED SOIL MOVEMENT REGISTRATION DEVICE IN PLACES WITH POSSIBLE LANDSLIDE EFFECTS AT PIPELINE RUNNING ROUTE | 2015 |
|
RU2602258C1 |
| COMPLEX FOR MONITORING MEASUREMENT OF GEOMETRY AND LEVELS OF STRESS STRAIN BEHAVIOUR OF MAIN PIPELINES | 2019 |
|
RU2727115C1 |
| SYSTEM TO DRY AND MONITOR CONDITION OF LANDSLIDE SLOPE | 2011 |
|
RU2479691C2 |
| DEVICE TO RECORD MOTION OF SOIL IN AREAS WITH POSSIBLE LANDSLIP PHENOMENA ALONG PIPELINE INSTALLATION ROUTE | 2011 |
|
RU2467123C2 |
Authors
Dates
2014-07-27—Published
2012-06-18—Filed