FIELD: gas production industry.
SUBSTANCE: invention relates to the structures aimed at the landslide processes impact minimization on gas transmission system objects and other industrial infrastructure facilities. Increased bearing capacity anti-landslide protective structure includes constructed of gabions protective wall, assembled from gabion frames prefabricated rigid spatial structure, installed on piles driven into the not subject to landslide phenomena rocks. Additionally contains mounted on the gabion frames vertical and horizontal rods strain gauges, as well as the data collection and transmission unit providing the information transmission from the strain gauges to the operator’s server.
EFFECT: technical result consists in provision of the interactive monitoring system, which allows to determine and quickly transmit the rigid composite spatial structure deformation value, assembles from the gabion frames, due to the landslide processes impact, as well as to determine the local deformation site, for prompt measures to eliminate or reduce the landslide processes negative impact on the protective structure.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
LANDSLIDE PROTECTION STRUCTURE | 2012 |
|
RU2531986C2 |
LANDSLIDE PROTECTION STRUCTURE | 2011 |
|
RU2498021C2 |
LANDSLIDE PROTECTION WORK | 2012 |
|
RU2524225C2 |
LANDSLIDE PROTECTION STRUCTURE | 2011 |
|
RU2498020C2 |
COMPLEX FOR MONITORING MEASUREMENT OF GEOMETRY AND LEVELS OF STRESS STRAIN BEHAVIOUR OF MAIN PIPELINES | 2019 |
|
RU2727115C1 |
LANDSLIDE PROTECTION STRUCTURE | 2012 |
|
RU2498018C2 |
METHOD OF ARRANGEMENT OF ENCLOSURES FROM SECANT BORED PILES | 2017 |
|
RU2693210C2 |
SYSTEM FOR MONITORING STRESS-STRAIN STATE OF MAIN PIPELINES | 2014 |
|
RU2568232C2 |
DEVICE FOR DETERMINATION OF PLANNED-ALTITUDE POSITION OF UNDERGROUND PIPELINES | 2018 |
|
RU2713998C1 |
DEVICE FOR DETERMINATION OF THE PLANE-ALTITUDE POSITION OF UNDERGROUND PIPELINES | 2016 |
|
RU2647215C2 |
Authors
Dates
2019-04-22—Published
2018-02-05—Filed