FIELD: oil-and-gas industry.
SUBSTANCE: proposed method comprises drilling of heat-injection wells, injection of heat carrier into bed, drilling of vertical drain-extract well at the deposit center, dewatering and drying of bed and product extraction therefrom. Note here that heat-injection two-mouth wells are drilled of horizontal-circular profile in radius equal to that of isometric deposit. Drilling is performed by coiled-tubing process (flexible tube) with using of flexible tube as well casing. Said flexible tube is not cemented. Flexible tube is perforated toward deposit center and to vertical drain-extract well.
EFFECT: efficient extraction of bitumen and increased yield.
3 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD OF DEVELOPMENT OF BITUMEN DEPOSITS OF ISOMETRIC SHAPE | 2012 |
|
RU2524705C2 |
| METHOD FOR BITUMEN DEPOSIT DEVELOPMENT | 2005 |
|
RU2307926C1 |
| METHOD OF BITUMEN DEPOSIT DEVELOPMENT | 2009 |
|
RU2395676C1 |
| METHOD FOR EXTRACTION OF BITUMINOUS DEPOSIT | 2002 |
|
RU2225942C1 |
| METHOD OF DEVELOPMENT OF BITUMINOUS OIL DEPOSIT BY THERMAL ACTION ON FORMATION | 2018 |
|
RU2687833C1 |
| DEVELOPMENT METHOD OF DEPOSIT OF HIGH-VISCOSITY OIL OR BITUMEN | 2011 |
|
RU2485304C1 |
| METHOD FOR EXTRACTING OIL-BITUMEN DEPOSIT | 2005 |
|
RU2287677C1 |
| METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSIT AT THERMAL EFFECT | 2011 |
|
RU2461705C1 |
| METHOD FOR EXTRACTING RESERVOIRS OF HIGHLY VISCOUS OIL OR BITUMEN | 2005 |
|
RU2289684C1 |
| METHOD FOR EXTRACTING DEPOSIT OF HIGH VISCOSITY OIL OR BITUMEN | 2005 |
|
RU2287679C1 |
Authors
Dates
2014-09-20—Published
2013-05-07—Filed