FIELD: oil-and-gas industry.
SUBSTANCE: proposed method comprises drilling with the boundaries of one formation of parallel horizontal or inclined horizontal injection wells and production well, injection of heat carrier in injection wells and oil withdrawal from production well. Production well is located at equal distance from injection well bottoms which rules out heat carrier outburst bur allows hydrodynamic communication with injection wells. Injection wells are provided with two parallel channels with filters alternating over production reservoir length. Channels are used for injection of heat carrier while, after reservoir heating, one of said reservoirs is used for in-well product flow towards production well.
EFFECT: higher efficiency.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF DEPOSIT OF HIGH-VISCOSITY AND HEAVY OIL WITH THERMAL EFFECT | 2018 |
|
RU2684627C1 |
DEVELOPMENT METHOD OF SUPER-VISCOUS OIL DEPOSIT | 2018 |
|
RU2695206C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES | 2010 |
|
RU2442883C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY AND HEAVY OIL WITH THERMAL ACTION | 2010 |
|
RU2442884C1 |
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS AND HEAVY OIL DEPOSIT BY THERMAL TREATMENT | 2010 |
|
RU2435948C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494241C1 |
METHOD OF DEVELOPMENT OF HIGH-VISCOSITY AND HEAVY OIL DEPOSIT WITH THERMAL IMPACT | 2018 |
|
RU2686766C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494240C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMEN | 2012 |
|
RU2496000C1 |
HIGH-VISCOUS AND HEAVY OIL FIELD DEVELOPMENT METHOD WITH THERMAL ACTION | 2008 |
|
RU2368767C1 |
Authors
Dates
2014-08-20—Published
2013-06-11—Filed