FIELD: oil and gas industry.
SUBSTANCE: depleted well operation plant contains two pumps. One of these pumps is installed on the surface and made with the possibility of using the working fluid from the reservoir pressure maintenance system and delivery of the noted liquid through pump-compressor pipes. The second pump is jet. It is installed in a borehole at the calculated depth and provides for the use of single or double production strings of lifting pipes. Jet pump has a fishneck and a pinned underneath it autonomous geophysical device. This device is designed to monitor the operation of the jet pump and the reservoir characteristics. There is a possibility to lower the geophysical device into the well with the nearing to the reservoir and removal from the well together with the jet pump with the help of a mounting tool and a rope or an rising flow of working fluid. The nozzle device for the jet pump has a channel for sampling reservoir fluid during evacuation by a jet pump, an opening for the outlet of a mixture of working and reservoir fluids, so that they can be lifted along the production string annular space. A non-return valve for separation of the reservoir and working fluid and a packer-anchoring equipment or a sealing device are installed under the jet pump.
EFFECT: increased processibility of well operation.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND WELL REPAIR FOR REPLACEMENT OF DOWNHOLE PUMPING EQUIPMENT WITHOUT ACTION ON FORMATION | 2015 |
|
RU2592903C1 |
METHOD FOR UNDERGROUND WELL REPAIR TO REPLACE SUBMERSIBLE EQUIPMENT AND EXCLUDE INFLUENCE OF WELL-KILLING FLUID ON PRODUCTIVE PLAST | 2016 |
|
RU2623750C1 |
UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF FORMATIONS | 2018 |
|
RU2724084C2 |
FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION | 2013 |
|
RU2531011C1 |
DOWHNOLE PUMP UNIT FOR SIMULTANEOUS AND SEPARATE OPERATION OF TWO FORMATIONS | 2012 |
|
RU2488689C1 |
PROCEDURE FOR INSULATING PERMEABLE SECTION OF PRODUCTION STRING OR PERFORATED INTERVAL OF IDLE FORMATION OF WELL (VERSIONS) | 2008 |
|
RU2383713C1 |
PUMP PACKER ASSEMBLY FOR DUAL PUMPING OF TWO BEDS | 2012 |
|
RU2493359C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SEQUENTIAL PRODUCTION OF FORMATION FLUID IN WELLS OF MULTILAYER FIELDS WITH USE OF DOWNHOLE DISCONNECTABLE WET CONTACT UNIT | 2011 |
|
RU2500882C9 |
DOWN-HOLE TESTING AND MEASURING COMPLEX AND METHOD FOR ITS INSTALLATION IN HORIZONTAL WELL | 2012 |
|
RU2487238C1 |
OIL-WELL UNIT AND METHOD OF ITS INSTALLATION | 2012 |
|
RU2498048C1 |
Authors
Dates
2017-06-15—Published
2016-07-04—Filed