FIELD: metallurgy.
SUBSTANCE: in compliance with this process metal is tapped at, at least 1630°C and, at tapping, added are: calcium carbide in amount of not over 2 kg per ton of steel, slag-forming materials in amount of 2.5-7 kg per ton of steel and aluminium in amount of 0.5-2.0 kg per ton of steel. During said out-of-furnace processing, metal is blown with inert gas for at least 40 minutes. Metal and slag are deoxidised by aluminium-bearing lumps taken in amount of 0.5-1.8 kg per ton of steel while metal is treated by calcium-bearing wire taken in amount of 0.1-0.3 kg per ton of steel.
EFFECT: higher purity of low-silicon steel, increased metal yield, lower production costs.
4 cl, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
LOW-SILICON STEEL PRODUCTION METHOD | 2023 |
|
RU2818526C1 |
MANUFACTURING METHOD OF LOW-SILICON STEEL | 2008 |
|
RU2353667C1 |
METHOD OF PRODUCING LOW-SILICON STEEL | 1999 |
|
RU2166550C2 |
METHOD OF STEEL PRODUCTION | 2013 |
|
RU2533071C1 |
METHOD FOR PRODUCTION OF STEEL WITH STANDARDIZED CONTENT OF SULFUR | 2019 |
|
RU2713770C1 |
METHOD OF PRODUCING OF LOW ALLOYED PIPE STEEL | 2014 |
|
RU2574529C1 |
METHOD OF PRODUCING STEEL WITH SPECIFIED LIMIT ON SULPHUR CONTENT | 2023 |
|
RU2816888C1 |
MANUFACTURING METHOD OF HIGH-CARBON STEEL WITH FURTHER CONTINUOUS POURING TO SMALL-SECTION WORKPIECE | 2011 |
|
RU2460807C1 |
METHOD FOR OFF-FURNACE STEEL TREATMENT | 2015 |
|
RU2607877C2 |
METHOD OF PRODUCING TUBE STEEL | 2016 |
|
RU2640108C1 |
Authors
Dates
2014-11-20—Published
2013-10-29—Filed