FIELD: oil and gas industry.
SUBSTANCE: method includes alternating gas injection and extraction to/from the well and during their alternation one part of the reservoir bed is isolated while the other is penetrated. According to the invention at the well construction stage the production string with a cement-inflatable packer is run in to the well and cemented; at that the packer divides the borehole annulus in the reservoir bed area into two conditional parts. The production string is perforated in both parts above and below the cement-inflatable packer. Thereafter a tubing string with a tubing-casing packer equipped with a circulation valve is run in so that when the tubing string is set to the production string the above circulation valve is placed below the cement-inflatable packer and above the tubing-casing packer between the perforated sections of the production string. Then the space between the production and tubing strings are filled with immiscible portions of the packer fluid. During further operation of the well injection of gas to the reservoir bed is made through the tubing string and lower perforation interval with temporary isolation of the upper perforation interval by one of the packer fluid portions while gas extraction is made through the upper perforation interval and tubular annulus with temporary isolation of the lower perforation interval by the other portion of the packer fluid.
EFFECT: increased efficiency of the method.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMPLETING AND OPERATION OF WELL OF UNDERGROUND GAS STORAGES | 2018 |
|
RU2686259C1 |
METHOD OF OPERATION OF A MULTIPLATE UNDERGROUND GAS STORAGE | 2017 |
|
RU2655259C1 |
METHOD OF WELL COMPLETION IN COMPLICATED CONDITIONS AND DEVICE FOR ITS IMPLEMENTATION | 2023 |
|
RU2818886C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL | 2019 |
|
RU2708747C1 |
METHOD FOR ELIMINATION OF FLUID CROSSFLOWS IN A WELL | 2018 |
|
RU2702455C1 |
METHOD FOR DEVELOPMENT OF HARD-TO-RECOVER OIL DEPOSIT AND DEVICE FOR ITS IMPLEMENTATION | 2023 |
|
RU2817946C1 |
METHOD TO RESTORE TIGHTNESS OF BOREHOLE ANNULUS IN WELL OF GAS FIELD OR FIELD THAT CONTAINS NATURAL GAS IN ITS PRODUCE | 2010 |
|
RU2431033C1 |
METHOD FOR ELIMINATION OF GAS CROSS-FLOWS BETWEEN STRINGS | 1990 |
|
RU2017935C1 |
INSULATION METHOD FOR BEHIND-THE-CASING FLOWS IN PRODUCTION WELL | 2020 |
|
RU2739181C1 |
METHOD OF GAS WELL COMPLETION | 2013 |
|
RU2534548C1 |
Authors
Dates
2014-11-20—Published
2013-06-13—Filed