FIELD: electricity.
SUBSTANCE: net nodes (P1, P2, …, P8) assess on the basis of data exchange with at least one another network node (P1, P2, …, P8) total power consumption (TE, TE') by plurality of the net nodes (P1, P2, …, P8). The respective net node (P1, P2, …, P8), which power demand is increased per required power quantity (Δx), compares the assessed total consumption (TE, TE') of power including the required quantity (Δx) of power, with the preset total power demand (LC) for plurality of the net nodes (P1, P2, …, P8) and initiates receipt of the required power quantity (Δx) from the power supplier (EP), if the assessed total consumption (TE, TE'), including the preset required power quantity (Δx) is less per the preset threshold value than the preset total power demand (LC).
EFFECT: decentralised control of power consumption.
23 cl, 2 dwg