FIELD: construction.
SUBSTANCE: method is to create an artificial barrier which helps to reduce the hydraulic cross section of the river. River ice cover softens when exposed to sunlight. A simultaneous destruction of a large area of the ice cover of the river occurs, and an artificial barrier in the form of ice jams made of small ice floes is formed.
EFFECT: floodwater level control on problem areas of the river.
| Title | Year | Author | Number | 
|---|---|---|---|
| DESTRUCTION OF ICE COVER | 2013 | 
 | RU2533025C1 | 
| ICE COVER SOFTENING METHOD | 2015 | 
 | RU2594115C1 | 
| METHOD FOR DESTRUCTION OF ICE COVER ON RIVERS | 2019 | 
 | RU2730037C1 | 
| WAY TO PREVENT ICE JAM | 2001 | 
 | RU2217550C2 | 
| METHOD OF CREATING ICE JAM | 0 | 
 | SU1194964A1 | 
| WATER HEAD STRUCTURE FOR RIVERS | 0 | 
 | SU1126644A1 | 
| METHOD OF ACCELERATED CREATION AND RESTORATION OF ICE CROSSING | 2017 | 
 | RU2642735C1 | 
| METHOD FOR ICE JAM FORMING | 0 | 
 | SU1728342A1 | 
| METHOD TO WEAKEN MONOLITH OF RIVER ICE COVER AND DEVICE FOR ITS REALISATION | 2010 | 
 | RU2452813C2 | 
| METHOD TO PROTECT PUBLIC AND TERRITORIES AGAINST FLOODS | 2013 | 
 | RU2547764C1 | 
Authors
Dates
2014-12-10—Published
2013-07-25—Filed