FIELD: construction.
SUBSTANCE: method is to create an artificial barrier which helps to reduce the hydraulic cross section of the river. River ice cover softens when exposed to sunlight. A simultaneous destruction of a large area of the ice cover of the river occurs, and an artificial barrier in the form of ice jams made of small ice floes is formed.
EFFECT: floodwater level control on problem areas of the river.
Title | Year | Author | Number |
---|---|---|---|
DESTRUCTION OF ICE COVER | 2013 |
|
RU2533025C1 |
ICE COVER SOFTENING METHOD | 2015 |
|
RU2594115C1 |
METHOD FOR DESTRUCTION OF ICE COVER ON RIVERS | 2019 |
|
RU2730037C1 |
WAY TO PREVENT ICE JAM | 2001 |
|
RU2217550C2 |
METHOD OF CREATING ICE JAM | 0 |
|
SU1194964A1 |
WATER HEAD STRUCTURE FOR RIVERS | 0 |
|
SU1126644A1 |
METHOD OF ACCELERATED CREATION AND RESTORATION OF ICE CROSSING | 2017 |
|
RU2642735C1 |
METHOD FOR ICE JAM FORMING | 0 |
|
SU1728342A1 |
METHOD TO WEAKEN MONOLITH OF RIVER ICE COVER AND DEVICE FOR ITS REALISATION | 2010 |
|
RU2452813C2 |
METHOD TO PROTECT PUBLIC AND TERRITORIES AGAINST FLOODS | 2013 |
|
RU2547764C1 |
Authors
Dates
2014-12-10—Published
2013-07-25—Filed