FIELD: construction.
SUBSTANCE: method includes actions to damage ice cover of a river and to erect a water barrier. The ice cover of the river is damaged by multiple parallel through slits 8. The water barrier 1 is erected in the form of an ice dam on a potentially flooded coast 5. The dam is built from ice blocks received as a result of sawing works on the river. The height of the dam must exceed the maximum level of the suggested water rise.
EFFECT: method makes it possible to speed up passage of floor waters during spring high water, to reduce economic damage from floods and to increase reliability of public and territories protection.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FLOOD CONTROL | 2018 |
|
RU2693655C1 |
TECHNIQUE FOR CONTROL OVER FLOOD | 2002 |
|
RU2225915C2 |
METHOD TO PROTECT AREA AGAINST FLOODING DURING SPRING FLOOD AND TEMPORARY WATER-BARRIER STRUCTURE FOR ITS REALISATION (VERSIONS) | 2012 |
|
RU2503771C1 |
METHOD FOR PREVENTING OVERFLOW | 2004 |
|
RU2333312C2 |
WAY TO PREVENT ICE JAM | 2001 |
|
RU2217550C2 |
METHOD FOR CONTROLLING LEVEL OF FLOOD WATERS ON RIVERS | 2013 |
|
RU2535252C1 |
METHOD FOR RIVER FLOW REGULATION TO PROVIDE FLOOD CONTROL | 2006 |
|
RU2304659C1 |
DAM | 0 |
|
SU1130651A1 |
AUTOMATED METHOD OF ESTABLISHING A FIXED DAM IN THE EROSION OF THE RIVER COAST | 2017 |
|
RU2648766C1 |
TEMPORARY WATER ENCLOSING STRUCTURE MADE OF ICE AND SNOW | 2015 |
|
RU2590813C1 |
Authors
Dates
2015-04-10—Published
2013-09-17—Filed