FIELD: construction.
SUBSTANCE: invention relates to construction and operation of hydraulic structures, in particular to methods of preventive protection of hydraulic structures, namely low-pressure bulk ground dams. Method of preventive protection of low-head bulk filled ground dam is carried out by means of pre-winter lowering of water level in water reservoir to increase area of contact of body of dam with ambient air temperature minus 40–50 °C, which causes enhanced deep freezing of the body and base of the dam, while reducing the area of thermal effect of the reservoir.
EFFECT: invention makes it possible to increase efficiency of preventive protection of low-pressure bulk ground dam.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE OF EXTENSIVE PROTECTION OF THE SURFACES OF THE TOP CANAL POUND OF LOW-PRESSURE BASED GROUND DAMS FROM BURROWING ANIMALS | 2017 |
|
RU2680683C1 |
METHOD FOR PHASED COMPLEX ENGINEERING PROTECTION OF GENERAL PLANNING EMBANKMENT | 2008 |
|
RU2390605C1 |
EARTH DAM ON PERMAFROST BASE WITH ANTI-FILTRATION BERM | 2020 |
|
RU2752948C1 |
LOW-PRESSURE GROUND OVERFLOW DAM WITH DOUBLE PRESSURE ON A PERMAFROST BASIS | 2022 |
|
RU2785457C1 |
GROUND DAM WITH A CRYOGENIC CURTAIN IN THE BODY AND IN THE BASE | 2017 |
|
RU2649021C1 |
ANTI-FILTRATION MEMBRANE OF LOW-HEAD DAMS AND DYKES FROM SOIL MATERIALS | 2013 |
|
RU2539147C2 |
COASTAL PROTECTION STRUCTURE OF FROZEN TYPE | 2022 |
|
RU2790448C1 |
METHOD OF PROTECTING LEDGES OF EDGES OF PITS OF CRYOLITHIC ZONE FROM THAWING | 2014 |
|
RU2551583C1 |
METHOD FOR FROZEN EARTH-FILLED DAM ERECTION | 2004 |
|
RU2310035C2 |
WATER ENGINEERING SYSTEM ON PERMAFROST SOILS | 2010 |
|
RU2416692C1 |
Authors
Dates
2019-04-18—Published
2018-04-23—Filed