FIELD: oil-and-gas industry.
SUBSTANCE: unit for calibration of borehole pressure and temperature gages contains a heat chamber, an operated heater located in a heat chamber cavity parallel to calibrated borehole devices, a reference thermometer, a reference manometer and PC operated control panel. The system is also fitted with a thermocryostat, and the heat chamber is designed as a horizontal metal bathtub with heat insulated walls. On the bathtub cover a hydropanel with deadweight gage piping is mounted. Inside the bathtub a temperature control unit, implemented as an electric heater, of a submersible circulation pump and piping, and also a reference thermometer are installed. At the bathtub bottom a horseshoe-shaped tube of the water cooling systems with two branch pipes laid outside from the bathtub end face and two replaceable lodgements for borehole devices are installed. From an opposite end face of the bathtub two casing-covered pipelines with valves, connected to a thermocryostat, are laid out. The bathtub is rigidly fixed on a frame with supports.
EFFECT: design simplification, calibration range expansion.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METROLOGY ASSEMBLY FOR SIMULTANEOUS CALIBRATION OF TEMPERATURE AND PRESSURE CHANNELS OF COMPLEX WELL EQUIPMENT | 2005 |
|
RU2306534C2 |
CALIBRATION SET TO TEST DOWNHOLE THERMOMETERS-MANOMETERS | 2002 |
|
RU2215998C1 |
HEAT METERING DEVICES, FLOW METERS OF VARIOUS TYPES METROLOGICAL CONTROL METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2664775C1 |
UNIT FOR CALIBRATION OF BOREHOLE LIQUID FLOWMETERS | 2014 |
|
RU2554688C1 |
METHOD FOR MEASUREMENTS OF DEBITS, MONITORING AND CONTROL OF OIL WELL PRODUCTION TECHNOLOGY AND INSTALLATION FOR ITS REALISATION | 2008 |
|
RU2365750C1 |
CALIBRATION OF HEAT POWER AND HEAT CARRIER MEASUREMENT SYSTEM | 2013 |
|
RU2567433C2 |
EXPERIMENTAL ASSEMBLY FOR STUDYING HEAT EXCHANGERS | 2015 |
|
RU2619037C2 |
HEAT PUMP CASCADE SETTING SYSTEM | 2018 |
|
RU2709008C1 |
METHOD OF CALIBRATING MEASURING SYSTEMS OF HEAT ENERGY ACCOUNTING UNITS AND CALIBRATING FLUID METERS AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2602748C2 |
METHOD FOR CALIBRATION AND VERIFICATION OF MEASURING SYSTEM OF ACCOUNT UNIT OF HEAT ENERGY AND HEAT CARRIER TAKING INTO ACCOUNT PERTURBATIONS | 2013 |
|
RU2578046C2 |
Authors
Dates
2015-04-20—Published
2014-02-12—Filed